Laserfiche WebLink
TABLE 1 <br /> Ground Water Elevation Data <br /> Chapin Bros., Inc. <br /> 1766 Monte Diablo Avenue, Stockton, California <br /> Casing Depth to Ground Ground Water <br /> Well No. Elevation Sample Date <br /> Water Elevation <br /> (Screen interval) <br /> 03-20-96 18.71 -11.33 <br /> 06-26-96 17.68 -10.30 <br /> 01-21-97 16.88 -9.50 <br /> 04-30-97 15.05 -7.67 <br /> MW-5 7.38 08-21-97 15.77 -8.39 <br /> (6-25') 12-04-97 16.19 -8.81 <br /> 03-31-98 11.31 -3.93 <br /> T 06-30-98 11.05 -3.67 <br /> 09-30-98 12.60 -5.22 <br /> 12-30-98 12.62 -5.24 <br /> 04-30-97 13.21 -7.62 <br /> 08-21-97 13.90 -8.31 <br /> 5.59 12-04-97 14.39 -8.80 <br /> MW-6 03-31-98 9.50 -3.55 <br /> (10'-30') 06-30-98 9.21 -3.62 <br /> 09-30-98 10.67 -5.08 <br /> 12-30-98 10.81 -5.22 <br /> 04-02-98 8.85 --- <br /> MW-7 5.37 06-30-98 9.08 -3.71 <br /> (5'-25') 09-30-98 10.73 -536 <br /> 12-30-98 10.64 -5.27 <br /> Lofes: <br /> •All measurements in feet <br /> Advanced GeoEnvironmental,Inc. <br />