My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012986
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
ARCHIVED REPORTS_XR0012986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2020 10:40:24 PM
Creation date
3/17/2020 3:46:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012986
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
01 March 1999 <br /> AGE-NC Project No. 95-0103 <br /> Page 8 of 8 <br /> 5.0. RECOMMENDATIONS <br /> Based upon data collected over the quarter at the site, AGE recommends: <br /> • Continual operation of the SVE/lAS system to aide in addressing the portions of the site with <br /> residual hydrocarbon-impacted soil and/or hydrocarbon-impacted ground water. <br /> • Continued monthly and quarterly ground water monitoring. The next ground water <br /> monitoring event is scheduled for March. During this quarter soil samples should be <br /> collected in accordance with the work pian addendum, dated 11 February 1998. <br /> • Abandon well MW-7 located east of the site, if the PHS-EHD agrees. The adjacent property <br /> is being sold and is in escrow. <br /> • During the next quarterly sampling event,collect water samples from vapor wells VE-3, VE- <br /> 5 and VE-6 and vapor well VW-2, if possible. <br /> • Based on the data from the next sampling event, prepare a work plan addendum to treat the <br /> off-site hydrocarbons in the areas of well MW-3. <br /> 6.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities. The findings were based upon <br /> analytical results provided by an independent laboratory. Evaluation of the geologic/hydrogeologic <br /> conditions at the site for the purpose of this investigation have been made from review of reports <br /> prepared by previous consultants and AGE, and a limited number of available data points (e.g., <br /> ground water and vapor samples collected from monitoring wells and extraction wells). Subsurface <br /> conditions may vary away from these data points. No other warranty, expressed or implied, is made <br /> as to the professional recommendations contained in this report. <br /> Advanced GeoEnvironmentai,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.