My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012992
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
ARCHIVED REPORTS_XR0012992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2020 10:42:14 PM
Creation date
3/17/2020 3:48:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012992
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. F2esi.dual fcical/water" mixture, oil, sll_cdge, sand, dirt, OT' other <br /> foreign material remaining in ttle tanks may be considered <br /> hazardous waste. If E.rjc:Q_Ir•jtE3red, it will have to be removed by <br /> a hazardous waste h�al_c1��T~ to a pt-(-,per waste disposal fac:i .lity. <br /> UwrC?r Wxl. l, t?E? r'e?�iF?c»!rc5sit?le fc_cT' all. taciciity.�:}roc-A CL"�5t5. <br /> 3. During excavation, if the tarikcs are found to have more than <br /> the rlc»!rwa 1. 6" c0nercpt e slab c:�ver them and/or are a ricased in <br /> r.•0rocrete, additi�-nal ec11.liprnc:?rlt will ber~equir'ed for~ removal. <br /> Rental equipment will be ctaarged at post plus 20%. Labor will <br /> be charged at $95. 00 per, fo:_-r two wen. <br /> 4. we will n3.t- be r•e sporiE;ib1e fc-r repair of underground plurlibinW, <br /> e?le(::.`tr'lcal c_4:Induit lines, c::cr" c::,tj'jer RJ,bstr'I. ct irlri encountered <br /> during eYu'F'Avatl.':iFt ::cf the taroks. If damage -:1cC_"I_lrfs, wE? will <br /> rE3f]air the dill-11a e on a t irlle ,And rilcateri,-.0 basis. Mat erlaIs <br /> c:I-P C:harK ed cit C"DSt jJIUS :I_l%. <br /> J. if the tank.S:i are (if abnormal size or r'onfigc..lration, owner- will <br /> be responsible for, any extra cost incurred in their~ transpor- <br /> tation and dinpr--'sal. <br /> 6. Jr, the evert additional w0r'k is required by the lead agency to <br /> excavate or dispose of contafninated material at the time of <br /> tank removal, we will FSerfOrrn the additional work con a time <br /> and materit�l. b,--A Si S. Extra excavGat ii on will be charged at an <br /> hc i-trl y rate, for the machine being used. All other services <br /> (exc^11_rdirlll disposal ) will be charged ;t cost PlIJ53 2()%- <br /> 7. We require} h�. l.f of tt-li s cl+_ccotation total as a deposit prior to <br /> starting work. The balance of the cll_cc::Atat iorl will be due and <br /> payable ups ri complet ic,n of the backfill procedure. Gopa 0r- '--of <br /> all contractor related paperworkwill be or'wrarded to the <br /> owner and the pr,:---per c-Agencies uporp reciept of final payment In <br /> fc.111. <br /> A. Tri they event inf any le:!yal ac_t iort or litigation to enforce cnr <br /> interpret ar'Py t C?r'M +_cr" of this agreement , it is <br /> agreed between the parties that J•im "fhorpe [til, Inc. shall <br /> recove'r from the Customer er Sari demand Jim Thorpe Oil, Incl s. <br /> r-pasonable attorneys' fees and costs ine..urred in such legal <br /> act i1:1n. Ti.rn l'Fior'pe Oil/Rich----MartConstruction credit terms <br /> rry r�l.�ir�� Elayrnr, r,t cif flim <br /> h invoiclut to bo r oc givwd by tho <br /> applicable due date. On eac_hr invoice napt Esc, romaid a late <br /> C"t"iargE-'� of E.'% mc-inthly will imposed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.