My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012995
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
ARCHIVED REPORTS_XR0012995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2020 10:41:45 PM
Creation date
3/17/2020 3:49:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012995
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
flay 3, 1993 <br /> '"Is "m D <br /> Public Health Services of Hut vr. <br /> San Joaquin County MAY 0 3 1993 <br /> Or. Harlan Knoll ENVftMEi ������ ALTH <br /> � 45 N. San Joagttin St. �� <br /> Stockton, CA 95201 <br /> Dear Harden: <br /> As expressed In our last conversation, the Department of Commerce has <br /> tentatively approved our application for funds to remove the UST's located at 1766 <br /> Monte Diablo Ave. Consequently, we are prepared to mave forward and obtain on <br /> approval on a site work plan and file for the necessary permits to Initiate the <br /> proposed work. <br /> In regards to the work plan, It is our desire to remove the UST's and beck-fill the <br /> �... rank excavations as soon as possible after tank removal and collection of the <br /> required soil samples. We feel this Is necessary because of the liability and <br /> safety concerns associated with the proximity of the site to Vlctory Elementary <br /> School and to the public sidewalks bordering the site. In addition, we also <br /> regtiest permission to haul any large amount of surplus dirt resulting from the <br /> excavation to our rural property located on Beyer Lane (plot-plan enclosed). <br /> We feel both of these requests would minimize site disturbance and mitigate <br /> safety hazards associated with small children being attracted to a twenty-foot <br /> pit located.directly across the street from their school. Also, we have advised Mr. <br /> France, principal of Victory School, of the'aflticiodied work and he shares our <br /> concern. He suggested that he would be happy.to send home a letter to the parents <br /> warming the children to take extra precautions when passing the site. <br /> On the matter of the nuts and bolts of the proposed project, we Intend to fence off <br /> both sides of the exposed area during the period of excavation and plan to have Jim <br /> Thorpe remove the UST's and resurface the yard. Additionally, we have contracted <br /> with Roger Foote Associates to Initiate the subsurface Investigation once tank <br /> removal and back-filling Is completed as Is requited by San Joequin'County and the <br /> California Regional Water quality Control Board (Foote work plan enclosed). <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.