Laserfiche WebLink
.Ur <br /> GeokgiadTe hlii& Inc. <br /> .274I'*yp';igRr4MA&M CR S53M 20!04W-4F.M <br /> ri Interim Soil&Groundwater Remediation-Bid Response Farts! <br /> Chapin Brothers Inc. <br /> GTI Project No.. 325.3 <br /> Date: May 24.19N i <br /> 12 Month 0px"tional Period, <br /> Qient Name. Chapin Brae.Ina <br /> Address: 1203 N.CMton Ave. <br /> SSto*M.CA 95201 <br /> 209-464-6947 <br /> Site Name, Chapin Bros.Inc. <br /> Address: 1766 Monte tx4ablo Ave <br /> Stacfcton,CA <br /> Preiponted below are Qpinion9 of Costs for prescnlaeci scope of work:Eriv7ronment8l Professionals <br /> and Contractors athe then Cn wiA work on this project-they are listed sit a separate pcge. <br /> FKASE STEP CODE& NO. COST TOTAL EST <br /> CODE DESCRIPTICWN UNIT UNITS /UNIT COOT <br /> 310 PROJECT PREPARATION&PERMI'M <br /> 101 BACKGROUND REVIEW HOURS 0 $o icy <br /> 122 HEALTH&SAFETY PLAN HOURS 0 $4 $0 <br /> 123 REMEDIAL ACTION PIAN HOURS 0 $D $0 <br /> 125 REMEDIAL DESIGN PLAN HOURS 0 s0 $0 <br /> 151 WELLMOnEHOLE PERMIT&APPLICATION PERMIT 1 $330 $330 <br /> 153 APOD AIC APPLICATION &ANNUAL FEE PERMIT 1 $355 $3y5 <br /> 156 ADJACENT"PROPERTY ACCESS AGREEMENT PERMIT 0 so $0 <br /> 167 WASTE DISPOSAL PERMIT PERMIT o so $0 <br /> MTNATr D TOTAL.PREPARATKN 4 P9*MFT6 $886 <br /> 349 REMEDIAL ECUP MENT,MATERIAL,&Wip'puES <br /> 211 Vapor Extraction Blower,Rltm,Vafue MONTH 0 $0 $0 <br /> 216 Emission Treat-Internai Combustion Engine MONTH 0 $0 $0 <br /> 215 Emission Troat•Thgrmat Oxidation(aub*contrais) MONTH 0 $D $0 <br /> 217 Emission Treat-Corbon Units(VSC-2000) UNITS 0 $0 so <br /> 218 Service per Carbon Unit (final design TBD) SERVICE 0 $0 $8 <br /> 291 Annual Waste Carbon Profife 8 MsHfest PROFILE 0 to SD <br /> 258 Air Sparge Equip-Sparge pofnta&C,ompressor MONTH 0 $D $0 <br /> 212 Masture Separator MONTH 0 ,$0 $0 <br /> 253 Wriifold System (final design TBD) WELL 8 $374 $2.99 <br /> 254 "Security Fence-wl razor mire&slats FEET 6o $29 $J440 <br /> ESTIMATED TOTAL-FEMEDMi EOLWM€NT,MATERIA!.,4 5WPLKS $4,430 <br /> $0 REMEIXALSYST>tr.M1 INSTALLATION A STARTui3 <br /> 225 DRILL i-Sparge Well (40'deep;2"diam) FEET 40 $43 51,725 <br /> 315 GFOLOGIC LOG/COLLECT SAMPLES FEE` 40 $17 $650 " <br /> 322 SOIL SMPL ANALYSIS UPH-G,STEX) SAMPLE 0 $0 $0 <br /> 322 GW SMPL ANALYSIS (TPH-G,STEX) SAMPLE 0 $0 $0 <br /> 256 "UTILITY INSTALL-electricity(final dssign TBD)INSTALL 0 $0 $0 <br /> 257 **UTILITY INSTALL-natural Gas(final design Tal INSTALL 0 w So <br /> 251 "THENCH A VES/AS PIPE(Tinal design TSD) FEET 350 $41 $14,3$0x" <br /> 820 VESrAS RELP DESIGNrINSTALL SUPERVISIOtr k0UR So $78 $34980-- <br /> 261 <br /> 3,880-261 VE51AS STARTUP/INMAL TEST HOUR 44 $77 $.1',375✓ <br /> 296 DRUM HANDELING&STORAGE DRUM 0 $0 $0 <br /> 182 WELL SURVEYING WELL 0 S0 ;0 <br /> t- 99TWATED TOTAL-SYSTEM POTALLATION L STAffruP^ $23,11Ipp <br /> 360 R,EMEMALSYSTEM OPERATION&MAINTENANCE <br /> 266 'UTILITY O&M-dfe ctticfty(final doslpn TSD) MONTH 0 $0 s0 <br /> 287'UTILITY O&M-natural pas(6raal design TBD) MONTH 0 $D $D <br /> 5r24M spa PM M MAINTENANCE-Therm Oxidizer MONTH 12 $145 $1,735 <br /> CM�phreo a!+595 <br /> Page 7 of 2 <br />