My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
ARCHIVED REPORTS_XR0012999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2020 10:36:03 PM
Creation date
3/17/2020 3:51:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012999
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
` NqY-24-1995 13:.."1 FROM 13EOLDGICTRL TECHNICS TO 4646947 P.07 <br /> 1 VLI`316%.#t1MI %AL4f#V1V1"" i1l�V�o�1P.f4dV�r <br /> q <br /> �. Required flaw rate through oxidtzer(check one) <br /> 200 Scfrm 400 Scfrn� 1,000 Sdn Cther�Scfm <br /> II Specify <br /> 2. Type of aux*vy Fuel available <br /> (Nat: Gas, LPG, etc.) ,E <br /> 3. If utility supplied matt. gas, avai4�hfeprassure Psig <br /> I <br /> 4. Eisctfical pow available _ _ _ o is ,_,,phase <br /> F <br /> volts -phase <br /> S. Mwrrnum expected vacuum on welks lnc es of H2O <br /> 6. Are their any noise abatement restrictions? please describe. <br /> ,a <br /> i <br /> 7. Is pre-heating the incoming furne stream required"? a: <br /> r <br />� 9. Is well injection air required? Valurne--_ - Scfm; Sic Pressor$ inches of <br /> H20. is preheated injection air required"? Desired temperature I <br /> :I <br /> 10. Chemical composition in percent by volume of the fume strum. Note: If the fume stream <br /> is expected to vary, please provide composition at start-up and expected aomposdion after <br /> steady state operations. <br /> Include 02, CO2, H2, CO, GH4, N2, 1-120vapor, Inert gases, etc. <br /> I ; � <br /> I <br /> I <br /> :y <br /> 'e <br /> V <br /> 'F <br /> li <br /> TOTPL P.07 .� <br />
The URL can be used to link to this page
Your browser does not support the video tag.