Laserfiche WebLink
CHAPIN BROTHERS, INC. � <br /> May 25, 1995 <br /> Page 6 <br /> TASK 4: PROGRESS SOIL SAMPLES <br /> • Drilling (Includes driller's fee and field work) $5,145 <br /> Miscellaneous field and sampling equipment $150 <br /> i <br /> g Laboratory Analyses I $ggs <br /> + Mileage <br /> Subtotal $6,315 <br /> To assess ther f ress ro <br /> p g o emediatr<oza, semi-annual soil samples will be collected from three soil <br /> boxings drilled on site to depths of approximately twenty feet below surface grade. Soil samples i <br /> will be collected using a drill rig equipped with hollow-stem augers. <br /> TASK 5; MONTHLY SYS'l EIM.MAINTENANCE FOR ONE YEAR <br /> + System Maintenance '! <br /> i $2,400 <br /> m Miscellaneous field equipment and materials <br /> Subtotal $3,000 <br /> The cost for Task 5 covers system maintenance for a period of one year, System and <br /> maintenance will include lubrication, oil and filter change, etc, The treatment system will be <br /> t maintained on a weekly basis, <br /> stgst r XL,4,afet M �F <br /> The proposed soil and ground water treatment systems at the subject site will be protected by a 6- <br /> foot-high barbed wire chain-link fencdfitted with wooden slats. Additional safety measures will <br /> include the use of "No Smoking" signs posted on all sides of the treatment enclosure, crash <br /> y posts, a mounted fire extinguisher, and an emergency 24-hour telephone number posted on the <br /> fence. �� l <br /> i I <br /> '0 <br /> I, Limitattgit� i� I <br /> The costs contained in this proposal are based on information contained in Geological Audit <br /> Services, Inc., March 1995 Final Remedial flan and Chapin <br /> � p Brothers Inc, levitation for Bid <br /> f; <br /> xe:y: +p}er WALLACE KUHL <br /> &ASSOCIATES INC. I <br />