My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0013001
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
ARCHIVED REPORTS_XR0013001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2020 10:37:22 PM
Creation date
3/17/2020 3:51:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0013001
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Advanced = � <br /> GeoEnvironmental, Inc . <br /> Hf Nl)1"thE 171 C(Lj1fi11711C! <br /> 03 April 1997 <br /> AGE-NC Project No. 95-0103 <br /> Mr. Russell Chapin <br /> CHAPIN BROS. <br /> 1203 North Carlton Avenue <br /> Stockton, California 95203 <br /> Subject: Remediation System Installation Update <br /> CHAPIN BROS., INC. <br /> 1766 Monte Diablo Avenue, Stockton, California <br /> Dear Mr. Chapin: <br /> The following is an update for installation of the soil extraction(SVE) and in-situ air sparging (IAS) <br /> remediation system at the referenced site: <br /> • The EnvioSparge IAS system was installed and connected to the existing sparging point <br /> piping and was operation on 24 March 1997. The IAS system will deliver 4 to 5 cubic feet <br /> per minute at a pressure of 12 to 15 pounds per square inch, adequate to volatilize the <br /> petroleum hydrocarbons in the ground water and begin the transfer of hydrocarbons from the <br /> dissolved ground water state into the soil vapor phase. However, additional IAS injection <br /> points will be required, as indicated in our letter of 28 March 1997. <br /> • The King, Buck/Hasstech (KBI-I) catalytic oxidation system (SVE) was installed and was <br /> operational on 01 April 1997. The SVE unit operated at a maximum flow rate for <br /> approximately for three hours. <br /> • At approximately 1800 hours, the 230 amp power at the P.G.&E. service connection to the <br /> site failed. The power demand of the SVE unit was greater than the service connection could <br /> supply. <br /> • Green Electric, contracted to perform all electrical connection procedures, is presently <br /> applying for the appropriate City of Stockton permits for the installation of the new and <br /> upgraded P.G.&E. service connection. Upon approval of the permit applications, Green <br /> Electric will install the necessary service connection. <br /> • We anticipate full scale startup procedures for both systems to commence on 08 April 1997, <br /> pending installation of the upgraded P.G.&E. service connection. <br /> 1803 West March Lane, Suite A, Stockton,California 95207 <br /> Telephone (209')956-0264 FAX (209)956-0700 <br />
The URL can be used to link to this page
Your browser does not support the video tag.