Laserfiche WebLink
AW•cro Fr"U11 f]ICUVA-1 & L.MLLWCLL i" MLL 71L 'JSr LJIZb I�J <br /> AUXLEINFELDER <br /> File INo. '1D-3725-01 <br /> Scpti tuber 21, 1993 <br /> Mr. Us Snaith <br /> Kause Construction <br /> 411 Main Street, Suite E <br /> Suisun, CA 94585 <br /> SrtbjleccMATERIALS TESTING SERVICES <br /> KENT'S OIL SERVICE <br /> STOCKTON, CALIFORNIA <br /> Dear Mr. Smith: <br /> Thin letter is to confirm our recent discussion regarding materials testing services at the Kent's <br /> Gil Service facility oil MiMr Street in Stockton, California. As you are aware, we havz <br /> previously been under contract with Frown arts Caldwell to provide geotechnical services for <br /> this pmject. In our letters dated July 13, and August 25, 1993 recommendations were <br /> �-' provided to Brown and Caldwell regarding the backfill of the excavation at the Kcnt Oil <br /> facility_ <br /> i <br /> Even thougi bI to cxcavation has extended to alit depth of approximately 45 feet, we understand <br /> that some eorttamination still remains in the bottom of the excavation. Apparently. Sari Joaquin <br /> County Environmental Health has requested that several feet of clay material be placed at the <br /> bottom of tht; excavation to act somewhat like a liner. We have concerns regarding the <br /> operation of equipment and the placement of men in the base of the excavation. For <afecv <br /> reasons we suggest that a plastic liner be considered is lieu of clay mattrial. Since the lc'6,cl <br /> of cbntarnination apparently is relatively low- we suggest khat multi layers or 6 or 10 mil <br /> visWtr) with proper overlapping and caulked seams be considered. <br /> We understand allot once the plastic finer is in placer that approximately 20 feet of free-draining <br /> gravel will be placed in the excavation. Prior to the placement of fill on the gravel, we <br /> recdrwnead that a large vibrating steel dram compactor be used to tfensify the gravel, We <br /> have assumed that the remainder of the backfill will be placed at approximate 1 foot lifts and <br /> that our technician would be scheduled to visit the site every 2 feet of bacl�ill- This would <br /> allow our technician to excavate 12 imhes below subgrade and evaluate the lower lift. For <br /> estirrrating purposes we have assumed approximately 13 trips to the site would be necessary <br /> since the depth of backfill will be approximately 25 feet. We have also assumed that two <br /> labora>:ory compaction curves would be needed as well as some supervision and a final report. <br /> C4pYrtght 7993 RErinfvtdar, Inc_ Page i of 2 <br /> KLErn+rELEItR 2825 f4it 5torkron. Ci 93203 :2094 946-1345 <br />