Laserfiche WebLink
The emphasis is on destruction of contaminants on-site through biological oxidarion. Remedia- <br /> tion is accomplished, however, without the addition of genetically engineered microbes. The <br /> FyreZvmel formulation is harmless to plant and animal life, and requires no protective equipment <br /> .� for handling or application. (See MSDS, Exhibit 4) <br /> F. Vaporization, when present, is eliminated with a non-flammable, water based volatilization <br /> agent. This agent is a blend of biodegradable emulsifiers, wetting and flame inhibiting agents which <br /> inhibit the volatilization of gasoline,jet fuels, helicopter fuels, aviation gasoline, crude oil, and most <br /> aliphatic and aromatic solvents. It eliminates the danger of fume inhalation, flammable and/or <br /> explosive conditions. A PID meter is used any time soil is disturbed to monitor vaporization. <br /> Scope of Work <br /> Two.75' X 150' bioremediation cells will be constructed in the parking lot west of the stock- <br /> piled soil. These cells will be contained by hay bale berms and lined with a flexible membrane liner <br /> protected by a six-inch sand base. <br /> The stockpiled contaminated soil will be screened to two inches. Large rocks and debris will be <br /> removed and stockpiled for disposal in a sanitary landfill. The screened soil will.be placed on top of <br /> the base-sand and spread to a maintained depth of 14" to 16". Additional contaminated soil, approxi- <br /> mately 5 feet in depth, will be removed from the excavation area, screened and placed in the biocell. <br /> Samples will be taken according to a sampling plan to ensure all contamination is identified. The <br /> ►M enzymes and water will be added and tilled into the soil as needed for 30 days. Soil-gas monitoring <br /> will be conducted with a PID meter to ensure control of all volatile organics. Vapor suppressant will <br /> be applied if vaporization is detected. The cell will be covered with a waterproof material to main- <br /> tain optimum temperature for bacterial activity and prevent excess moisture in the case of rain. The <br /> cleaned soil will be used as backfill for the excavation area. <br /> `' Permiffinct <br /> Permitting authority and local agency oversight for UST Site Mitigation is the San Joaquin <br /> County Public Health Services, Environmental Health Division (PHS/EDH) 209/468-3450. All <br /> work plans, and remediation activities will be coordinated through this agency. <br /> Workplan <br /> �- Construct two 75' X 150' flexible membrane and sand lined, berthed biocells <br /> adjacent to the stockpiled soils; <br /> Excavate the stockpiled soil, screen to two inches and place the soils into the <br /> biocells; <br /> Excavate an additional 5 ft. of soil from the original excavation site, screen and <br /> place in the biocell. <br /> x ;make_18.sbi1samples,..from,the.excava6on area; (See Exhibit 5) eight fr6it t ; <br />