Laserfiche WebLink
i <br /> v . <br /> Gcnaral Engineering Contractor Lic.05885.87 <br /> I�KAUSE.- INC. <br /> CON & T R U C T I O N <br /> INVOICE#2332 <br /> DATE :JANUARY 5, 1994 <br /> JOB#10193 <br /> TO: SHELDON OIL CO. <br /> 426 MAIN ST. <br /> SUISUN CITY CA. 94585 <br /> TERMS: DUE ON RECEIPT <br /> PROJECT BREAKDOWN OF INVOICE# 2322. 9120!93, 9/28!93 TO 11/16/93 PROVIDE <br /> LABOR, EQUIPMENT, AND MATERIALS TO COMPLETE THE EXCAVATION OF SAMPLES <br /> FOR TESTING, POLY LINE THE HOLE, IMPORT PEA GRAVEL, BACKFILL AND <br /> COMPACTION OF THE HOLE AT KENT'S OIL. <br /> PRELIMINARYITEMPORARY FACILITIES <br /> BROWN WATER, DRINK WATER, MISC. SUPPLIES.. <br /> ;123.87 <br /> ..• FOREMAN 93 HOURS <br /> ;so46.o0 <br /> LABORERS 91 HOURS <br /> ;3185.00 <br /> PC 300 EXCAVATOR W/OPERATOR 8 HOURS <br /> ;1120.00 <br /> 966 CAT LOADER W/OPERATOR 121 HOURS <br /> ;13189.00 <br /> 650 CASE DOZER W/OPERATOR 907.5 HOURS <br /> ;8600.00 <br /> SHEEPFOOT COMPACTOR W/OPERATOR 60 HOURS <br /> ;sooa.00 <br /> WATER TRUCK WI OPERATOR 34 HOURS <br /> ;1972.00 <br /> LASER 1 DAY <br /> ;76.00 . <br /> EQUIPMENT MOBILIZATION GRK&VARIOUS HAULERS <br /> $1431.20 <br /> POLY LINER, CAULKING EQUIPMENT AND MATERIALS. <br /> ;1474.99 <br /> 2076.8 TONS PEA GRAVEL LOADED, HAULED, AND PLACED. <br /> ;18898.22 <br /> KLEINFELDER ANALYSIS & COMPACTION TESTING. <br /> _ ;622.16 <br /> TOTAL NOW DUE AND PAYABLE..................................;63,134.43 <br />