Laserfiche WebLink
s` i <br /> T <br /> F.f ' <br /> Golden Grain company <br /> January 11 , <br /> 202/799-5045.01 <br /> WF*,L DEVELOPMENT <br /> The wells would be developed by hand bailing to remove gilts <br /> ncrease the <br /> and clays from the casing <br /> and gravel pack to i <br /> efficiency of the wells for subsequent testing. <br /> WELL ELEVATIONS <br /> _ The new and existing well heads would be surveyed with an <br /> provide elevation control for the calculaion of <br /> autolevel to p t <br /> established datum, <br /> hydraulic gradients. If possible, a nearby <br /> provided by <br /> the City of Manteca Public Works Department, would be r A <br /> sa <br /> utilized. <br /> GROUNDWATER MONITORING <br /> to <br /> Each well would be monitored Y►esm�tdswater outlined indSOP <br /> thickness of any free product, using <br /> 8 (Appendix VIII} . <br /> GROUNDWATER SAMPLING AND ANALYSIS <br /> Samples of groundwater would be collected from <br /> r m selctedsubmitted <br /> wells according to sops 9 and 10 (Appendix VIII) <br /> --Ir analyses of TPS as gasoline, <br /> BTEX, Organic lead, and EDB <br /> tical methods would be similar to those <br /> concentrations. Analy <br /> Because MW-1 through MW-4 are so close to <br /> rsed for soil samples• upper water <br /> one another, only one of these wells completed in the upp Product <br /> system would be sampled. Also, no wells containing free <br /> id b� sampled. <br /> 22 <br />