Laserfiche WebLink
t <br /> V. LeCommedat ons <br /> E <br /> At this time, it appears that remedial action is necessary <br /> at the Manteca Bean facility. Steps that should be taken at <br /> this time to initiate site remediation include: <br /> 1. Development of detailed plans and specifications for <br /> the groundwater treatment system. The plan may include <br /> drilling of a 14" production well <br /> performance sof ga <br /> inside the present building and <br /> short-term pump test to determine optimum flow rate and <br /> _�. dewatering potential of the water bearing units. <br /> 2, Development of a treatment plan for remediation of <br /> hee workplan would investigate cost <br /> contaminated soil. T <br /> effectiveness of soil aeration and/or in-situ venting <br /> specificatinstechniues r for remediation.treatment et scheme ailed pwould and <br /> developed. <br /> 3. coordinate remediation planning with Quaker oats/Golden <br /> Grain staff and present the selected approach to the <br /> appropriate regulatory agencies as directed by Quaker <br /> Oats/Golden Grain. <br /> 1 <br /> t <br />