Laserfiche WebLink
I' <br /> REPORT OF ADDITIONAL <br /> MONITORING WELL INSTALLA'T'IONS <br /> MANTECA BEAN COMPANY <br /> MANT£CA, CALIFORNIA <br /> I, <br /> SUTqn5try f Work Performed <br /> one well permit application covering two monitoring wells <br /> was submitted and approved on December 8, 1987 (Appendix A) . <br /> Drilling and associated soil sampling began on December 21, <br /> Dling <br /> riland was completed an December 22, 1987• The locations <br /> 1987 <br /> of the two new monitoring wells, MW-7 and MW-8, are shown an <br /> Plate 1 in Appendix B. <br /> The boreholes were advanced by Water Development Corporation <br /> using a Simco the desired drill sampling depths.rig and <br /> The augerslwere low shot <br /> augers to each well. <br /> water (200' F) pre sure cleaned prior to drilling <br /> Twelve (12)-inch 0.D. hollow stem The ers were used as a <br /> 12-inch augers were <br /> temporary surface casing in MW-7. <br /> advanced to 25 feet, where 8-inch augers were used inside <br /> them to advance the borehole to its total depth <br /> 8-inch f 50 fOeD. <br /> Mw-8 reached a total depth of oSamPl�sewE recollected at five <br /> hollow stem augers• <br /> foot intervals from the ground surface to total depth with a <br /> 2-inch I.D. modified California Sampler with brass sleeves. <br /> were <br /> The soil samples retained in stic rend sleeves <br /> aps Vetightly <br /> examined, sealed with teflon, plastic <br /> in cold storage for <br /> wrapped with tape, labeled, and kep A geologic/soil lag <br /> transport to the chemical laboratory• the drilling <br /> for each well was kept in the field during of cover <br /> plasticoand covered pending laboratory er cuttings were danalysison 6 . poly- <br /> cover <br /> The boring logs containing sample intervals, subsoil <br /> penetrated, and well cr:,,eruction details of MW-7 <br /> conditions peendix C. The two (2) monitoring <br /> and MW-8 can ne found in Ar, <br /> wells, MW-7 and MW-40 were <br /> completed <br /> m le ed enedusing 2 s ctionsC (0020 <br /> jointed, schedule pressure <br /> inch slat size) . The casing was hot water (200"F) <br /> cleaned before placement into the hwith`r a stem <br /> 2minrhers. The <br /> threaded <br /> bottom of the casing was cape <br /> flush--joint PVC cap. The annular space h the well was <br /> backfilled through the hollow stem augers (which were pufeet <br /> up in 5 foot sections) with Lonestar 03 sand to two (2) foot <br /> above the top of the screen section- the sand two (and the <br /> bentonite seal was placed on top <br /> -_remaining annular space was <br /> with a--flush-cover, was ginstalled <br /> watertight locking._. _..._ <br /> m� at least 1-inch higher than the surrounding <br /> surface...._._._ e....__. <br />