My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0013012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MOFFAT
>
757
>
3500 - Local Oversight Program
>
PR0545572
>
ARCHIVED REPORTS_XR0013012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2020 10:43:13 PM
Creation date
3/18/2020 4:53:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0013012
RECORD_ID
PR0545572
PE
3528
FACILITY_ID
FA0006855
FACILITY_NAME
ECKERT COLD STORAGE COMPANY
STREET_NUMBER
757
STREET_NAME
MOFFAT
STREET_TYPE
BLVD
City
MANTECA
Zip
95366
APN
22104041
CURRENT_STATUS
02
SITE_LOCATION
757 MOFFAT BLVD
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
tf;HFE1VT]R0IVMEAT U COASULTANTS, INC. <br /> L .wealth & Safetj-Plan <br /> L <br /> 1.0 IEALTHAND SAFETYPLAN <br /> %Nim' Environmental Consultants, Inc.; has adopted the following health and safety <br /> procedures for worldng with organic vapors and liquid.contaminants encountered during <br /> drilling and excavation of subsurface soil. The purpose of this program is to provide health <br /> and safety precautiom5 for the initial and subsequent site visits until the nature and <br /> magnitude of the contaminants have been defined. <br /> LL 1.1 Personnel ResponsihiUdes <br /> A1; personnel assigned or involved with the remedial investigation or site clean utas <br /> will have an assigned responsibility. The outlined responsibilities will estabu-sh <br /> L standards for personnel protective wear. safety procedures and provide. :or <br /> emergency actions which could arise during project operations. <br /> 1.2 Project?Manager (PM) <br /> LThe Project Manager diaerts all project operations. Project Manager (PM), in <br /> cooperation with the Project Safety Officer ,PSO), has the primary responsi-bility <br /> for ensuring that the safety pian is read, signed, and fully understood by all <br /> employees and, outside persons allowed around or -%ithin designated worlang <br /> Perimeters of the job site. <br /> In cooperation with the PSO, he is responsible for ensuring that at altimes during <br /> project operations, all employees adhere strictly to the Health and Safety Plan. <br /> 1.3 Proiec7 Safety Officer (PSO) <br /> The PSO shall direct and emSure that all employees P Yees „amply with the health and <br /> Safety Plan. The PSO has the primary responsibility for: <br /> L I <br /> 1. Assuring that appropriate personnel protective equipment is available and <br /> Lproperly utilized by all on-site personnel. <br />
The URL can be used to link to this page
Your browser does not support the video tag.