Laserfiche WebLink
WHF Environmental Consultant-, Inc. <br /> Health & Safety Plan <br /> Page: 3 <br /> Z.0 SAFETYIMPLEMENTA7TON <br /> The provisions of the WFIF Environmental Consultants, Inc- Health and Safety Plan are <br /> for all personnel associated with the site prgiiect and operations. <br /> A complete background review and site visitation will be conducted in order to deter--nine <br /> whether specific amendments are to be made to the Health and Safety Pian based on <br /> specific characteristics which may exist on the job site. Any suspected hazards associated <br /> with the on-site operation which exposure to, via inhalation or skin absorp-tion, to such as <br /> suspected carcinogens or human sterilants, will be docu_-mented and specific guidance will <br /> be developed and added to this Health and Safety Plan as Appendices. <br /> A defined project site layout is paramount to the safe completion of all remedial site in- <br /> vestigations. The project site layout has built-in safety features. The site is divided into <br /> three zones. The following list defines the required personnel protective equipment. <br /> 2-I Personnel Protective Eq&upment(PPE) <br /> Personnel who will be working in or around the exclusion zone of the job site will <br /> use the following protective equipment and measures as warrant by the Project <br /> Manager- <br /> - Coveralls as an undergarment <br /> - Saranex outer garment <br /> Sample gloves (inner) <br /> - PVC, Mtrile or Neoprene outer gloves <br /> Hard hat <br /> - Steel toe boots <br /> - Robars or Tingley boots <br /> - Full face-piece respirator with R53HE cartridges (a combination of organic <br /> vapor, acid gas, pesticide, radionuclide, high efficiency filter). Note that <br /> cartridges should be changed daily. <br /> - All joints to be taped <br /> - Self-contained air will be utilized if project dictates <br /> More stringent protective equipment requirements will be implemented if <br /> necessary. This determination will be made by the project supen-isor after reN iew <br /> of the materais to be handled, the ambient monitoring data, consultation with on- <br />