Laserfiche WebLink
MEN —Epilill <br /> t�=MINN PTAWL�_M'111__AM i <br /> in. EMPIRE W2,111,71-91-M <br /> ZERO= - 2 <br /> .7 1 MIN MEMO <br /> W_,_ WWO low K0 <br /> If necessary, upon exit from the work site, loose debris will be removed <br /> from protective clothing by brushing or rinsing. Gloves and boots will be <br /> decontaminated in a 5% solution of trisodium phosphate and rinsed with water <br /> which will be disposed of on-site. Respirator cartridges, per-filters, <br /> inner gloves and coveralls will be placed in a drum on-site for disposal. <br /> No one will. exit the site with contaminated clothing or equipment. <br /> EMERGENCY RESPONSE <br /> If the potential exists for fire, explosion or toxic material release during <br /> on-site activities. Prior to commencement or any activities, personnel will <br /> have available telephone numbers and contacts for emergency response assistance <br /> including: <br /> 0 Ambulance <br /> 0 Fire Department <br /> 0 Hospital <br /> 0 Poison Control Center <br /> 0 Community Evacuation Contact <br /> Emergency equipment on-site will include: <br /> i:' 0. Portable eyewash bottles <br /> 0 Industrial first aid kit <br /> SITE SECURITY <br /> Access during all on-site activities will be restricted to authorized personnel. <br /> All personnel and authorized visitors must contact the Safety Coordinator/ <br /> Project Manager prior to entering and exiting site. <br /> RECORD KEEPING <br /> All site safety records pertaining to the site characterization study will be <br /> maintained by the Safety Coordinator/Project Manager throughout the project. <br /> AIR-MONITORING <br /> The Safety Coordinator/Project Manager will conduct periodic air monitoring <br /> using direct reading sampling equipment as required. At a minim= the <br /> following monitoring will be performed. <br /> V <br />