Laserfiche WebLink
3 <br /> :!"� Shags 1 Hrdroaeoleole/ueesament work plan <br /> 1 Moreland"-.Urt Shell <br /> 7700 M6raland Court,Sto&ton,CA <br /> Delta Project No.40-ISS-148 <br /> Page e <br /> F <br /> 4.0 SCHEDULE <br /> Irf Delta will proceed with the work outlined in this plan as$oon as approval is obtained. A drilling <br /> crew will be mobilized to drill the proposed soil borings within two weeks of approval of this plan. <br /> i <br /> i Laboratory analysis of soil samples generally requires three weeks. A summary report of the results, <br /> including information on subsurface geology,ground water depth and flow direction,water-supply <br /> wells in the area,monitoring well construction details,and recommendations for further assessment <br /> or remedial activities will be prepared within three weeks after laboratory results are received. <br /> 5.0 REMARKSLSLGNATUBM <br /> The recommendations contained in this report represent our professional opinions. These opinions <br /> tri <br /> 4. are based on currently available information and are arrived at in accordance with currently accepted <br /> hydrogeologic and engineering practices at this time and location. Other than this,no warranty is <br /> implied or intended. <br /> DELTA ENVIRONMENTAL CONSULTANTS, INC. 3 <br /> This report was prepared by: Date: rhe?F� <br /> r Sandra L.Lindsey <br /> Geologist/ <br /> Project Manager <br /> r1� This report was reviewed Ify: v Date- <br /> Michael <br /> ate Michael J. O'Br n <br /> j r Hydrogeologist/ ; <br /> Department Manager <br /> tThis report was prepared <br /> } under the supervision �4. ��N HR©�S.r,4�J, <br /> of a California Registered a <br /> Geologist: Dat <br /> Brian L. KrogseW, <br /> California Registered ��a• �CC� <br /> Geologist#2303 � <br /> rc <br /> : <br /> AIJ <br /> F , <br /> !�./�� <br />