My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012601
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MORELAND
>
7700
>
3500 - Local Oversight Program
>
PR0545583
>
ARCHIVED REPORTS_XR0012601
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2020 10:59:06 PM
Creation date
3/19/2020 2:34:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012601
RECORD_ID
PR0545583
PE
3528
FACILITY_ID
FA0003732
FACILITY_NAME
99 SHELL*
STREET_NUMBER
7700
STREET_NAME
MORELAND
STREET_TYPE
ST
City
STOCKTON
Zip
95212
APN
13003010
CURRENT_STATUS
02
SITE_LOCATION
7700 MORELAND ST
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V ..1. V�" f M1X� � � 1, �.'., _ s�- '�--- .�� J• 76 3" �r�.Y.! S <br /> 'r. <br /> ingestion of,and direct skin contact with,potentially hazardous materials that may be encountered <br /> at the site. The pian describes(1)personnel responsibilities,(2)protective equipment to be worn as <br /> appropriate when working on the site. <br /> .4 1`Persannel ftaeaonsLWJJdU <br /> Key personnel directly involved in the investigation who will be responsibla for monitoring the <br /> M execution of safe work actives and the provisions of this plan are (1) the drilling-subcontractor <br /> project supervisor and (2) the Delta project field manager. These personnel are responsible for <br /> knowing the provisions of the plan, communicating plan requirements to workers under their <br /> supervision and to site visitors, and for enforcing the plan. <br /> 4.2 ftUgllnel <br /> F The designated personnel-protective equipment is selected to prevent field pertonnel from exposure <br /> to gasoline fuel products that may be present at the site. To prevent direct skin contact, following <br /> protective clothing will be worn as appropriate while working at the site. <br /> 1. Hard hat with optional face shield <br /> 2. Tyvek coveralls <br /> 3. Butyl rubber or disposable vinyl gloves ! <br /> r 3 4. Steel toe boots <br /> S. Goggles gg es or safdty glasses(if optional face shield not used on the hard hat) <br /> ter The type of gloves used will be determined by the type of work being performed. Drilling personnel <br /> will be required to wear butyl rubber gloves because they will have long-duration contact with the <br /> subsurface materials. Delta sampling personnel will wear disposable gloves when handling any <br /> Fes . sample. These gloves will be changed between each sample. <br /> E Personnel-protective equipment shall be put on before entering the immediate work area. The <br /> Isleeves of the coveralls shell be outside of the cuffs of the gloves to facilitate removal of clothing <br /> Y i f,t with the least potential contamination of personnel. if at any time protective clothing (coveralls, <br /> } „ t boots,or gloves)becomes torn, wet, or excessively soiled, it will be replaced immediately._-- --- <br /> s ' Total organic vapors will be monitored at the site with a portable photoionixation detector. Should <br /> tha total organic vapor content approach that of the threshold limit value (TLV) for any of the <br /> substances listed in Table A-1,appropriate safety precautions will be carried out under the direction <br /> k <br /> y <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.