My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MYRTLE
>
2731
>
2900 - Site Mitigation Program
>
PR0537457
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2026 2:59:56 PM
Creation date
3/19/2020 3:41:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0537457
PE
2950 - ENVIRON ASSESS
FACILITY_ID
FA0021545
FACILITY_NAME
SAN JOAQUIN RTD/SARDEE VACANT LOT
STREET_NUMBER
2731
Direction
E
STREET_NAME
MYRTLE
STREET_TYPE
ST
City
STOCKTON
Zip
95205-4718
APN
15702002
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
2731 E MYRTLE ST STOCKTON 95205-4718
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 <br /> Attorney-Client Privileged <br /> duplicate sample is treated independently of its counterpart in order to assess <br /> laboratory performance through comparison of the results <br /> 9. FIELD NOTES <br /> A field logbook will be used to document the vital project and sample information. At a <br /> minimum, the following sample information will be recorded: See attached log sheet at <br /> the end of this work plan. <br /> • Sample ID <br /> • Location <br /> • Date & Time <br /> ■ Ambient temperature (if possible) <br /> • Weather conditions <br /> • Soil head space monitoring data (i.e. PID reading, etc) <br /> • Any other field comments by the sampler (s) <br /> 10. PHOTOGRAPHS <br /> Photographs will be taken at the sampling location and at surrounding areas. The <br /> photographs will verify information entered in the field logbook. Each photograph taken <br /> will be written in the logbook with the approximate time, date, and location. <br /> 11. MANAGEMENT OF RESIDUES <br /> TRE's subcontractor will be place all soil cutting and residues/wastes generated as the <br /> result drilling operations on visquine and cover it with visquine and secure it in place. <br /> RTD shall be responsible for analyzing and properly recycling and or disposing the soil <br /> cuttings. <br /> Page 9 of 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.