Laserfiche WebLink
GROUNDWATER SAMPLING FORM <br /> PROJECT INFORMATION <br /> c <br /> PROJECT NAME �C Ctg, �L PROJECT NUMBER_Y,`63250 <br /> ,� WELL NO IVIW- <br /> PROJECT MANAGER J VA TYPE OF WELLy Monitonng Extraction 1he <br /> RECORDED BY SAMPLED BY DATE JQtI <br /> WELL PURGING INFORMATION <br /> PU5GE VOLUME PURGE METHOD <br /> V, C2-i ng Diameter <br /> Pl 2-m <br /> E ch 4-inch Other !% Baiter - Type <br /> Well Total De thy 1 Z Pum - Type <br /> p �eet below Top of Casing,TO o Other Specify <br /> Depth to Water ��f 2! feet below Top of Casing,WL <br /> Hydroca on Odors <br /> Water Column Length•�feet <br /> es No <br /> PurgerVolume Calculation (Water Column Length x Multiplier x No Volumes = Calculated Purge Volume) <br /> b , 01 X 0117, X -'3. - Calculated Purge Volume = 70 It ins <br /> (WCL) (Muttiplier) {No Volumes) Actual Purge Volume = gallons <br /> NWRlolter (Cas4gg 0iametVrE#j#es1= Gallonsflmear foon 2=a 17 4=Q66 5=1 5 S=Zff <br /> A <br /> Groundwater Parameter Measurement- Meter Type alibratedYes No <br /> TIME ELAPSED FLOWRATE DTW pH EC TFUP TURBOrrY REDOX COMMENTS- <br /> TIME (GPND (ft) -anhoslcm22 <br /> ❑ (N711) mV <br /> deg F <br /> 6121 7� 0, 3 <br /> 12 6 C t 3 <br /> r <br /> 5 <br /> 7 <br /> F11V7RONMEH7At,GEOTECNhpC SS 5IATESINC. <br /> E <br />