Laserfiche WebLink
�v <br /> o� <br /> r , GROUNDWATER SAMPLING PQRM <br /> PROJECT INFORMATION 3 <br /> PROJECT NAME ?rciE-�� (�7�]!1 _PRQJEZT NUMEER 5�� 32;,01b) WELL NO I� <br /> — I <br /> PROJECT s1r1ANAGER 'DVA TYPE OF WELL Mae,ltanng EctrdCtian Gather ' <br /> RECCREED BY SAMPLED SY QATE 9-9-0 <br /> ! <br /> VVE=L. PURGING INFORMATION, j <br /> PURGE VOLUME PURGE METHOC <br /> 11 acing 01ameter <br /> vl' Z-inch 4-anch Other �,8at3er - i ype rfr <br /> 0 <br /> WeIE Total Oe ih 6 Pump - Type <br /> p feet below Tap of Casing,TO Other - Specify <br /> Oepth to Water 6�XJL feet below Tap of Casing,WL Hydrocarbon Cd i <br /> ., Yes Na <br /> Water Column Length 10.3feet <br /> Purge Volume Caictiatton (Water Calurm Length x Muihplier x No Volumes = Calculated Purge Vaiume) <br /> 1 V,�Q X C2 r t---� X 'Z Cf Caicuiated Purge Volume = _ �2 -gallons <br /> (WCL) (MutHatler) (No Volumes) Actual Purge Volume = Y gallons <br /> ittttlol#er (Cali Oiacne#er fT}lcrtesi Gal[apslEitteaFfoot Z-4 � 4=sZ65 =1'S <br /> 8-2-5 <br /> Groundwater Parameter Measurement Meter Typeyalibrated Ayes No <br /> TIME Ei APScO FLOWRATE 0TW pH EC TURBOTY REDOX L�COMfv�i7ENTS <br /> TIME (GPM) {ftp anhcslcrn tN�M my � � K'J R�� <br /> a P <br /> t03 a- 0 sus I 19. z I <br /> Icri-G I U.oS Si I�r-G <br /> k0152- 1 QJ� 3, 22 571 Qr <br /> "T= <br /> I <br /> I I E ! <br /> I <br /> I I <br /> I I <br /> I <br /> I <br /> 1 <br /> � ASSO1 IAT rr INC <br /> a!'� <br /> Ei�MRO Ai GfiCTECN ''�+• I <br />