Laserfiche WebLink
1�1 y1 y •) <br /> GROUNDWATER SAMPLING FORM <br /> PROJECT INFORMATION v <br /> OJECT NAME PC (Q%S-V It-C- PROJECT NUMBER 103,On02 WELL NO MVRC <br /> PROJECT MANAGER IWA TYPE OF WELL Monitoring Extraction Other <br /> RECORDED BY SAMPLED BY' <br /> DATE. <br /> v WELL PURGING` INFORMATION <br /> PURGE VOLUME PURGE METHOD <br /> Well Cq=ng❑lameter <br /> 1/2-inch 4-inch Other atter - Type <br /> Wel[Total Cepth 0 i2 Z feet below Top of Casing,To Pump - Type <br /> Other - Spectfy <br /> Depth to WaterG �Q feet below Tap of Casing,WL Hydro <br /> rbon Odors <br /> Water Column Length`�JZ feet Yes No <br /> Purge Volume Calculation (Water Column Length x Multiplier x No Volumes = Calculated Purge Volume) <br /> J q t I ` X ® t X - -w Calculated Purge Volume oalIons <br /> (WCL) (Mutttplter) (No Volumes) Actual Purge Volume cradans <br /> Mti lollQr Casfrn Ciatneter rkichesj t;; Gallonsalinearfoatl Z=CY 1'P 4=0 55` 6=15; at--2-6 <br /> ;KS 1 3 S— <br /> Groundwater Parameter Measurement: Meter Type TC1' A 5-4tz�a allbrated *-4es No <br /> TIME ELAPSED FLCWRATE BTW pH EC I TiJREI0rrY REDOX COMMENTS R <br /> TIME (GPM) (g) Qnhaslem It) WTL0 MV X 1r <br /> AN <br /> 1 <br /> o <br /> r � <br /> rQ 6 <br /> I <br /> %=ASSOCIATES INC <br /> - ENViR4NNFa11-AL,G�EC74N7CAL ANO MATEFfALS PfiCfi�QN.�LS <br />