My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
1443
>
2900 - Site Mitigation Program
>
PR0505371
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2020 3:09:59 PM
Creation date
3/23/2020 3:08:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505371
PE
2950
FACILITY_ID
FA0006738
FACILITY_NAME
VIKTRON CALIFORNIA
STREET_NUMBER
1443
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16330017
CURRENT_STATUS
01
SITE_LOCATION
1443 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SOP #12 <br /> Date:9/1/93 <br /> Page 6 of 31 <br /> 4.0 <br /> RESPONSIBILITIES AND QUALIFICATIONS <br /> The Project Manager or Task Leader is responsible for assigning project staff to <br /> perform CPT- investigation and sampling activities. The Task Leader is also <br /> responsible for assuring that this and any other appropriate procedures are followed <br /> by all project personnel. <br /> The project staff assigned to the collection of data, soil samples, and ground water <br /> samples with CPT techniques are responsible for completing their tasks according to <br /> this and other appropriate procedures. All staff are responsible for reporting <br /> deviations from the procedure or nonconformance to the Task Leader, Project <br /> Manager, or Project QA/QC Officer. <br /> Only qualified personnel shall supervise subcontractors hired to perform this <br /> procedure. At a minimum, ERM-West, Inc., employees qualified to supervise CPT <br /> investigations and sampling will be required to have: <br /> • Read this SOP; <br /> • Indicated to the Task Leader that all procedures contained in this SOP are <br /> understood; <br /> • Completed the OSHA 40-hour training course, and/or annual 8-hour <br /> refresher course, as appropriate; and <br /> • Previously performed CPT investigations and sampling in a manner <br /> generally consistent with the procedures described in this SOP. <br /> ERM-West, Inc., employees who do not have previous experience supervising CPT <br /> techniques will be trained on site by a qualified ERM-West, Inc., employee. A <br /> qualified California-certified R.G. or P.E. will oversee progress of the project, results, <br /> and interpretations. The Project Manager shall document personnel qualifications <br /> related to this procedure in the project QA files. <br />
The URL can be used to link to this page
Your browser does not support the video tag.