My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
1443
>
2900 - Site Mitigation Program
>
PR0505371
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2020 3:09:59 PM
Creation date
3/23/2020 3:08:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505371
PE
2950
FACILITY_ID
FA0006738
FACILITY_NAME
VIKTRON CALIFORNIA
STREET_NUMBER
1443
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16330017
CURRENT_STATUS
01
SITE_LOCATION
1443 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> worker as to what protection is needed, and must provide proper training <br /> in the use of the safety equipment. The required personal protective <br /> clothing to be worn is assigned by this health and Safety Plan. <br /> Work activities will require level D protection. Level D protection is as <br /> follows: <br /> • Long-sleeve shirt and long pants; <br /> • Outer nitrile gloves at a minimum for all material-handling. Inner <br /> latex surgical gloves are recommended where practical; <br /> • Steel-toed boots or safety shoes; <br /> • Safety glasses; and <br /> • Hard hat. <br /> Other personal protection readily available for use, if necessary, include <br /> the following: <br /> • Chemical-resistant gloves; and <br /> • Hearing protection. <br /> 8. Safety Procedures: <br /> Procedures must be followed to ensure suitable site control so that persons <br /> who may be unaware of site conditions are not unnecessarily exposed to <br /> hazards. The work area will be barricaded by tape, warning signs, or flags. <br /> Any equipment or machinery will be secured and stored safely. <br /> Site Entry/Access-Access inside the specified work area will be limited to <br /> authorized personnel. Only ERM employees and designated ERM <br /> subcontracted personnel, as well as designated employees of the Client, <br /> will be admitted to the work site. Only those workers possessing evidence <br /> of the required current 40-hour OSHA health and safety training or <br /> current 8-hour refresher will be permitted in the designated exclusion <br /> zone. The Site Safety Officer will be responsible to ensure workers wear <br /> proper personal protective clothing. All personnel entering the site will <br /> sign the signature document at the end of this HSP, indicating they have <br /> read and accepted the health and safety practices outlined in this plan. <br /> All personnel entering the site will exit at the same location. If <br /> decontamination is necessary exiting the site will include following <br /> decontamination procedures. There must be an alternate exit established <br /> for emergency situations. The emergency exit is to be used for <br /> emergencies only. <br />
The URL can be used to link to this page
Your browser does not support the video tag.