Laserfiche WebLink
1 L-It,EN <br /> 1959232M".M <br /> • <br /> ibailer The water sample is collected, labeled and handled according to the Quality <br /> Assurance Plan Water generated during the monitoring event is disposed of according to the <br /> 1 accepted regulatory method pertaining to the site <br /> 1 5 QUALITY ASSURANCE PLAN <br /> This section describes the field and analytical procedures to be followed by ENSR <br /> throughout the investigation <br />' 5 1 General Sample Collection and Handling Procedures <br /> Proper collection and handling are essential to ensure the quality of a sample Each sample <br /> 1 will be collected in the appropriate container, preserved correctly for the intended analysis <br /> and stored, prior to analysis, for no longer than the maximum allowable holding time <br /> Details on the procedures for collection and handling of soil samples from this project can be <br /> found in previous sections <br /> 5 2 Sample Identification and Chain-of-Custody Procedures <br /> Sample identification and chain-of-custody procedures ensure sample integrity and <br /> document sample possession from the time of collection to its ultimate disposal Each <br /> 1 sample container submitted for analysis will have a label affixed to identify the job number, <br /> sampler, date and time of sample collection and a sample number unique to that sample <br />' During soil sampling, this information, in addition to a description of the sample, field <br /> measurements made, sampling methodology, names of on-site personnel and any other <br /> pertinent field observations will be recorded on the borehole log or in the field records <br /> 1 <br />' Celebrating 35 Years of Excellence in Environmental Services <br />