Laserfiche WebLink
THE MARK <br /> inril .ROUP <br /> Water Purging & <br /> Sampling Log <br /> ENGINEERS 5 GEOLOGISTS, INC <br /> Date —479-' 47 7 Sample Location <br /> Project Name Project No, <br />' Weather Conditions <br /> Observations/Comments - <br /> Samples Collected By <br /> J--r <br /> QUALITY CONTROL <br /> Purging/Sampling Metho <br /> Method to Measure Water eves <br /> iPump Lines or Bailer Ropesne eaned dedicated ` <br /> Method of Cleaning Bailer/Pump <br /> pH Meter No D l Date Calibrated f <br /> Sp Conductance Meter No L42A Date Calibrated . l rteg <br /> 16 PURGING AND SAMPLING DATA <br /> Water Level (below MP) Start • �• o End - "' 17 ' ( � - <br /> � <br /> Measuring Point (MP) <br /> Time Pump Rate Discharge pH Temp Sp Cond Color Odor Turbidity <br /> (gpm) (gallons) (•C) (Kmhos/cm) <br /> - 0 ° YC70 ' <br /> �a v <br /> 1 <br /> Total Discharge Casing Volumes <br /> ' Method of Disposal of Discharge Water <br /> Sheet,. of <br />