Laserfiche WebLink
i <br /> inrTHE <br /> il MARK Water Purging & <br /> oRoup Sampling Log <br /> ENGINEERS d, GEOLOGISTS, INC <br /> Date— / �' g Sample Location " <br /> Project Name Project No , _/r /� �(Io?• <br /> Weather Conditions <br /> Observations/Comments -�- <br /> Samples Collected By <br /> QUALITY CONTROL <br /> to <br /> Purging/Sampling Metho <br /> i Method to Measure Water eves <br /> Pump Lines or Bailer Ropes. ne eased dedicated <br /> Method of Cleaning Bailer/Pump <br /> pH Meter No. Date Calibrated rI <br /> Sp Conductance Meter No. Daterated g <br /> PURGING AND SAM <br /> � TA <br /> d" <br /> Water Level (below MP) Start r ' End �_- <br /> ge �r. (cG /C;?.to 43 Z V7. <br /> Measuring Paint ( P) <br /> Time Pump Rate Icharg pH Temp Sp Cond Calor Odor Turbidity <br /> (gpm) ( ons) (*C) (,,(mhos/cm) <br /> /2" &.0 o " YC70 <br /> / <br /> 21 ,7 1 re I let <br /> a:4c!5' .3 6 [9.5 y 410 4 Its <br /> k <br /> f <br /> i <br /> i <br /> Total Discharge �+ _ - Casing Volumes y <br /> Method of Disposal of Discharge Water <br /> Sheet,. of _�___ <br />