Laserfiche WebLink
11 See-Specific <br /> 1 <br /> ENGINEERS & GEOLOGISTS, INC Health and Safety Pian <br /> (Continued) <br /> ONSITE CONTROL. MEASURES <br /> AUTHORITY <br /> has been designated to coordinate access control and site security A safe <br /> perimeter around the zone has been established as follows <br /> No unauthorized personnel should be within this area <br /> COMMAND POST/STAGING AREA <br /> The onsite Command Post and Staging Area have been established at <br /> The prevailing wind conditions are <br /> The Command Post and Staging Area are upwind from the zone <br /> CONTROL BOUNDARIES <br /> Control Boundaries have been established and the High Hazard Zone, Hazard Barrier Zone, and the Clean/Low <br /> Hazard Zone are designated as follows <br /> These boundaries are identified by <br /> ATTACH MAP OF CONTROL AREAS <br /> Paqe of _ <br />