Laserfiche WebLink
' THE <br /> inrlsMARK <br /> .R.UPSubcontractor Safety & <br /> �GINEERS & GEOLOGISTS, INC <br /> Site Rules Check List <br /> The following check list must be reviewed and signed by the subcontractor and the MARK Group, Engineers & Geologists, <br /> Inc (MARK)'s project safety officer prior to the scheduled start of a job <br />' HEALTH & SAFETY PLAN <br /> ❑ Subcontractor agreees to comply with the requirements of MARK's Master Health and Safety Plan <br />' ❑ Subcontractor has received a copy of the Site-specific Health and Safety Flan and agrees to comply with Its <br /> requirements <br /> GENERAL <br /> ❑ All vehicles entering the job site must observe a maximum speed limit of 10 MPH,unless otherwise posted Seatbelts <br />' must be worn at all times <br /> ❑ Hard hats and steel-toed boots are required at all times except in designated areas <br />' ❑ Smoking or eating is permitted In designated areas only <br /> ❑ Subcontractor is to maintain good housekeeping during duration of work Daily trash pick up is required At the end <br /> of the lob the subcontractor must leave the fob site in at least as good an appearance and condition as it was found <br /> ❑ The subcontractor has reviewed with the project safety officer the emergency evacuation route and telephone Incase <br /> 10 of emergency, notify site supervisor immediately and call the appropriate service <br /> Fire Department <br /> Ambulance <br /> Sheriff <br />' ❑ MARK job site work rules prohibit <br /> a Possession or consumption of Intoxicants or illegal drugs or narcotics <br />' b Violation of Federal and State safety regulations <br /> c Gambling <br /> d Possession and/or use of firearms <br /> e Fighting, horseplay or practical joking <br /> f Sabotage or pilfering <br /> Running, except in emergency <br />' ❑ All accid orsonal injury or property damage) must be reported to the MARK Project Safety Officer as soon as <br /> emergenc�fcc, ns no longer exist The person involved must make a written accident report prior to leaving the <br /> site, unless prevented by emergency conditions, e g injury <br />' ❑ Personnel not directly engaged in the work are not permitted on the site without MARK management approval <br /> The MARK Group, Engineers& Geologists, Inc By Date <br />' Subcontractor By Date <br />