My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0006286
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
1240
>
3500 - Local Oversight Program
>
PR0545598
>
ARCHIVED REPORTS_XR0006286
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2020 4:12:19 PM
Creation date
3/23/2020 4:06:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006286
RECORD_ID
PR0545598
PE
3528
FACILITY_ID
FA0001304
FACILITY_NAME
STOCKTON SCAVENGERS ASSOCIATION
STREET_NUMBER
1240
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
CURRENT_STATUS
02
SITE_LOCATION
1240 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1010 3 Airborne Pollutants <br /> All project personnel shall be alert for airborne pollution due to sand-blasting dust, <br /> smoke, fibers, or blown soil, and shall report such conditions to his or her supervisor so that <br /> action can be taken for its suppression <br /> 10 10 4 Asbestos <br /> t If asbestos in any form is encountered on a project site, the affected area shall <br /> immediately be evacuated and not re-entered until the Project Safety Officer has developed <br />�j <br /> a specific plan for safe control of the asbestos hazard <br /> If asbestos material is to be removed, the work shall be performed by qualified <br /> asbestos removal subcontractors according to a complete Site-specific Health and Safety <br /> Plan, prepared either as an original plan or as an amended and extended plan if the asbestos <br /> is unexpectedly discovered during the progress of the work The Plan will be developed in <br /> consultation with an Industrial Hygienist experienced in the management of asbestos waste <br /> The asbestos removal work shall be performed only by properly trained and equipped <br /> subcontractor personnel and the Site-specific Plan shall provide for safe control of the <br /> asbestos from the time it is first encountered until it is disposed as waste in the prescribed <br /> manner at a permitted facility <br /> 1011 Machinery and Equipment <br /> The following safety rules apply to the use of machinery and equipment (Note Refer <br /> also to Section 10 13, Vehicles) <br /> i <br /> 10-16 REV 4/92-EGI <br /> Mrs <br />
The URL can be used to link to this page
Your browser does not support the video tag.