Laserfiche WebLink
Off ice <br /> Existing Employee <br /> And Visitor — I I I Maintenance <br /> Parking Area I I I Building I f <br /> 1 MW-1 (<0.05) — <br /> a <br /> 0 <br /> North <br /> / Pit Truck <br /> C Wash <br /> T Islands <br /> 1 Y I�M <br /> W-2 I <br /> ` , I <br /> 1 d1 (0.37)�I — — -- — <br /> �- - - <br /> co <br /> FR Concrete f <br /> 3 <br /> Valley <br /> / Gutter <br /> 0.30 � f <br /> Explanation 1 f —1 -. <br /> South <br /> Monitoring Well I Pit <br /> L_ I II <br /> (0.58) Diesel Concentration (mg/1), — <br /> = July, 1994 L — — — <br /> _ <br /> Isoconcent ration Contour, <br /> dashed where uncertain �D.20� Dispenser Island <br /> MW-3 (O.D98) Excavation <br /> Scale in Feet MW-4 l9 <br /> M (<0.05) <br /> LU 0 10 20 30 <br /> 4 <br /> 1SOCONCENTRATION PLOT- DIESEL <br /> P ROJ ECT NO. <br /> QUARTERLY GROUNDWATER MONITORING - 92-1177103.80 <br /> ill r THE NOVEMBER 1994 <br /> N MARK STOCKTON SCAVENGER ASSOCIATION DRAWING NO. <br /> GROUP,INC. STOCKTON, CALIFORNIA 5 <br /> ENGINEERS & 0 E 0 L 0 G I S T S <br /> J <br /> m <br /> r <br />