Laserfiche WebLink
LEGEND <br /> ® EXISTING STRUCTURE <br /> MW-5 <br /> 436' <br /> -4 40' P1 • SOIL PROBE BORING LOCATION <br /> MW-1MONITORING WELL LOCATION <br /> -$42' -/ RELATIVE GROUND WATER <br /> ELEVATION CONTOUR <br /> MW-4 <br /> • \ \ (-5 70') <br /> P8 <br /> --4 80' <br /> 1 <br /> MW-7 Mw <br /> -4 84' \` -4 ryg' �• <br /> ` P9 -4$0 <br /> P5 <br /> P4 mW-d <br /> -4 8 <br /> ° P3 <br /> A g0 i <br /> P2 <br /> \ <br /> NW-3 • qd <br /> -4 92' �Q <br /> ►` <br /> P ib <br /> • <br /> /MW-2 <br /> i <br /> oF <br /> / I <br /> �O <br /> �b <br /> OFFICE P8. <br /> 642 <br /> -_._.-----29--MAY 2001 <br /> STORM DRAIN DITCH \ <br /> i <br /> NAVY DRIVE <br /> N <br /> 0 930 e0 GROUND WATER ELEVATION MAPAd En d nmentai, Inc. <br /> FEff MEL BOrK4IDES PETROLEUM, INC ofA am <br /> 2191 NAVY DRIVE PROJECT NO ACE—NC-98-0534 FILE MELNAV3 c <br /> URE <br /> STOCKTON, CALIFORNIA DATE 09 SFPT MBFR 2001 DRAWN 9Y MAC <br />