My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
713
>
2300 - Underground Storage Tank Program
>
PR0521604
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2023 11:06:45 AM
Creation date
3/24/2020 3:32:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0521604
PE
2371
FACILITY_ID
FA0014678
FACILITY_NAME
NATIONAL PETROLEUM
STREET_NUMBER
713
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13905214
CURRENT_STATUS
01
SITE_LOCATION
713 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> s <br /> AMD PROGRAM CONSOLIDATED FOR <br /> TANKS 0/ ✓' <br /> UNDERGROUND STORAGE TANKS - TANK PAGE 1 <br /> (Two pa �- _ <br /> k) <br /> Page_of <br /> TYPE OF ACTION ❑ I.NEW PERMIT ❑ 4.AMENDED PERMIT ® 5.CHANGE OF INFORMATION ❑ 6.TEMPORARY TANK CLOSURE 430 <br /> (Check one item only) ❑ 3.RENEWAL PERMIT ❑ 7.PERMANENTLY CLOSED ON SITE <br /> (Specify reason) (Specify reason) ❑ 8.TANK REMOVED <br /> BUSINESS NAME(Same as FACILITY NAME or DBA-Doing Business As) 3. FACILITY ID: I <br /> C;u� S Emk S _ " <br /> LOCATION WITHIN SITE(Optional) ^I W el <br /> 31 <br /> I.TANK DESCRIPTION <br /> (A scaled plot plan with the location of the UST system including buildings and landmarks shall be submitted to the local agency.) <br /> TANK ID# 432. TANK MANUFACTURER 433. COMPARTMENTALIZED TANK 0 Yes ❑ No 434 <br /> 03 Xerxes If"Yes,"complete one page for each compartment. <br /> DATE INSTALLED 435. TANK CAPACITY IN GALLONS 436. NUMBER OF COMPARTMENTS 437 <br /> (YEAR/MO) <br /> 12-20-03 8,000 2 <br /> ADDITIONAL DESCRIPTION(For local use only) 438 <br /> II.TANK CONTENTS <br /> TANK USE 439. PETROLEUM TYPE 440 <br /> ® 1. MOTOR VEHICLE FUEL ❑ I a. REGULAR UNLEADED ❑2. LEADED [15. JET FUEL <br /> (If checked,complete Petroleum Type) ❑1 b. PREMIUM UNLEADED ®3. DIESEL [:16. AVIATION GAS <br /> ❑ 2. NON-FUEL PETROLEUM ❑lc. MIDGRADE UNLEADED ❑4. GASOHOL ❑99.OTHER: <br /> ❑ 3. CHEMICAL PRODUCT COMMON NAME (from Hazardous Materials Inventory page) 441. CAS#(from Hazardous Materials Inventory page) 442. <br /> ❑ 4. HAZARDOUS WASTE <br /> (Includes Used Oil) <br /> ❑ 95.UNKNOWN <br /> III. TANK CONSTRUCTION <br /> TYPE OF TANK [11. SINGLE WALL [33. SINGLE WALL WITH EXTERIOR [15. SINGLE WALL WITH INTERNAL BLADDER SYSTEM 443. <br /> (Check one item only) MEMBRANE LINER ❑95. UNKNOWN <br /> ®2. DOUBLE WALL E-14. SINGLE WALL IN A VAULT [199. OTHER <br /> TANK MATERIAL-primary tank ❑1. BARE STEEL [13. FIBERGLASS/PLASTIC ❑5. CONCRETE [195.UNKNOWN 444. <br /> (Check one item only) [12. STAINLESS STEEL [14. STEEL CLAD W/FIBERGLASS ®8. FRP COMPATIBLE ❑99.OTHER: <br /> REINFORCED PLASTIC FRP W/100%METHANOL <br /> TANK MATERIAL-secondary tank [11. BARE STEEL ❑3. FIBERGLASS/PLASTIC ®8. FRP COMPTIBLE W/100%METHANOL ❑95.UNKNOWN 445 <br /> (Check one item only) [12. STAINLESS STEEL [14. STEEL CLAD W/FIBERGLASS ❑9. FRP NON-CORRODABLE JACKET ❑99.OTHER <br /> REINFORCED PLASTIC(FRP) ❑10. COATED STEEL <br /> ❑5. CONCRETE <br /> TANK INTERIOR LINING ❑1.RUBBER LINED ❑3.EPDXY LINING ❑5.GLASS LINING [:195.UNKNOWN 446. DATE INSTALLED 447, <br /> OR COATING ❑2.ALKYD LINING ❑4.PHENOLIC LINING ®6.UNLINED ❑99.OTHER <br /> Check one item only) <br /> OTHER CORROSION ❑1.MANUFACTURED CATHODIC [13.FIBERGLASS REINFORCED PLASTIC [195.UNKNOWN 448. DATE INSTALLED 449, <br /> PROTECTION PROTECTION [14.IMPRESSED CURRENT ❑99.OTHER <br /> If Applicable ❑2.SACRIFICIAL ANODE <br /> SPILL AND OVERFILL YEAR INSTALLED 450. TYPE 451. OVERFILL PROTECTION EQUIPMENT: YEAR INSTALLED 452. <br /> (Check all that apply) ® I.SPILL CONTAINMENT 2003 ❑ 1.ALARM ®3.FILL TUBE SHUT OFF VALVE 2003 <br /> ®2.DROP TUBE 2003 ❑2.BALL FLOAT_ ❑4.EXEMPT <br /> ®3.STRIKER PLATE 2003 <br /> IV.TANK LEAK DETECTION <br /> (A description of the monitoring program shall be submitted to the local agency.) <br /> IF SINGLE WALL TANK 453. IF DOUBLE WALL TANK OR TANK WITH BLADDER 454, <br /> (Check all that apply) (Check one item only) <br /> [11. VISUAL(EXPOSED PORTION ONLY) ❑5.MANUAL TANK GAUGING(MTG) ❑1.VISUAL(SINGLE WALL IN VAULT ONLY) <br /> ❑2. AUTOMATIC TANK GAUGING(ATG) ❑6.VADOSE ZONE ®2.CONTINUOUS INTERSTITIAL MONITORING <br /> ❑3. CONTINUOUS ATG ❑7.GROUNDWATER ❑3.MANUAL MONITORING <br /> ❑4. STATISTICAL INVENTORY RECONCILIATION [18.TANK TESTING <br /> (SIR)+BIENNIAL TANK TESTING ❑99. OTHER <br /> V.TANK CLOSURE INFORMATION/ PERMANENT CLOSURE IN PLACE <br /> ESTIMATED DATE LAST USED(YR/MO/DAY) 455. ESTIMATED QUANTITY OF SUBSTANCE REMAINING 456• TANK FILLED WITH INERT MATERIAL? 457. <br /> gallons ❑Yes ❑ No <br /> UPCF hwfwrc-b(1/99)-1/4 http://www.unidoes.oi-g Rev.02/16/00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.