Laserfiche WebLink
RNIFIED PROGRAM CONSOLIDATED Ft„aM <br /> TANKS <br /> UNDERGROUND STORAGE TANKS - TANK PAGE 1 <br /> (Two pages per tank) <br /> Page_of_ <br /> TYPE OF ACTION L NEW PERMIT ❑ 4.AMENDED PERMIT ❑ 5.CHANGE OF INFORMATION ❑ 6.TEMPORARY TANK CLOSURE 430 <br /> (Check one item only) ❑ 3.RENEWAL PERMIT ❑ 7.PERMANENTLY CLOSED ON SITE <br /> (Specify reason) (Specify reason) ❑ 8.TANK REMOVED <br /> BUSINESS NAME(Same as FACILITY NAME or DBA-Doing Business As) 3. FACILITY ID: 1 <br /> R . <br /> LOCATION WITHIN SITE(optional) 431. <br /> 7�' p � SSG 76 <br /> I.TANK DESCRIPTION <br /> (A scaled plot plan with the location of the UST system including buildings and landmarks shall be submitted to the local agency.) <br /> TANK ID 432. TANK MANUFACTURER 433. COMPARTMENTALIZED TANK ❑Yes [KNo 434. <br /> 0 It YL Q2 1/�F. s If"Yes,"complete one page for each compartment. <br /> DATE INSTALLED 435. TANK CAPACITY IN GALLONS 436. NUMBER OF COMPARTMENTS 437 <br /> (YEAR/MO) 6 /0 -3 -30, OOO I <br /> ADDITIONAL DESCRIPTION(For local use only) 438. <br /> II.TANK CONTENTS <br /> TANK USE 439• PETROLEUM TYPE 440. <br /> V 1. MOTOR VEHICLE FUEL la. REGULAR UNLEADED ❑2. LEADED ❑5. JET FUEL <br /> (Ifchecked:complete Petroleum Type) ❑ lb. PREMIUM UNLEADED [13. DIESEL [16. AVIATION GAS <br /> ❑ 2. NON-FUEL PETROLEUM ❑ Ic. MIDGRADE UNLEADED ❑4. GASOHOL ❑99.OTHER: <br /> ❑ 3. CHEMICAL PRODUCT 441. CAS#(from Hazardous Materials Inventory page 442. <br /> COMMON NAME (from Hazardous Materials Inventory page) rY P g ) <br /> ❑ 4. HAZARDOUS WASTE <br /> (Includes Used Oil) <br /> ❑ 95.UNKNOWN <br /> III.TANK CONSTRUCTION <br /> TYPE OF TANK ❑ I. SINGLE WALL ❑3. SINGLE WALL WITH EXTERIOR [15. SINGLE WALL WITH INTERNAL BLADDER SYSTEM 443. <br /> (Check one item only) MEMBRANE LINER ❑95. UNKNOWN <br /> C92. DOUBLE WALL [14. SINGLE WALL IN A VAULT ❑99. OTHER <br /> TANK MATERIAL-primarytank ❑ I. BARE STEEL [:13. FIBERGLASS/PLASTIC ❑5. CONCRETE ❑95.UNKNOWN 444. <br /> (Check one item only) ❑2. STAINLESS STEEL ❑4. STEEL CLAD W/FIBERGLASS E68. FRP COMPATIBLE ❑99.OTHER: <br /> REINFORCED PLASTIC(FRP) W/100%METHANOL <br /> TANK MATERIAL-secondary tank ❑1. BARE STEEL [13. FIBERGLASS/PLASTIC 50 8. FRP COMPTIBLE W/100%METHANOL ❑95.UNKNOWN 445. <br /> (Check one item only) ❑2. STAINLESS STEEL [14. STEEL CLAD W/FIBERGLASS [:19. FRP NON-CORRODABLE JACKET ❑99.OTHER <br /> REINFORCED PLASTIC(FRP) ❑10. COATED STEEL <br /> [15. CONCRETE <br /> TANK INTERIOR LINING ❑ I.RUBBER LINED ❑3.EPDXY LINING ❑5.GLASS LINING ❑95.UNKNOWN 446. DATE INSTALLED 447. <br /> OR COATING ❑2.ALKYD LINING ❑4.PHENOLIC LINING 6.UNLINED ❑99.OTHER <br /> (Check one item only) <br /> OTHER CORROSION ❑ I.MANUFACTURED CATHODIC [13.FIBERGLASS REINFORCED PLASTIC ❑95.UNKNOWN 448. 1 DATE INSTALLED 449. <br /> PROTECTION PROTECTION ❑4.IMPRESSED CURRENT ❑99.OTHER <br /> (1f Applicable) ❑2.SACRIFICIAL ANODE <br /> SPILL AND OVERFILL YEAR INSTALLED 450. TYPE 451. OVERFILL PROTECTION EQUIPMENT: YEAR INSTALLED 452. <br /> (Check all that apply) 1.SPILL CONTAINMENT O3 ❑ 1.ALARM 3.FILL TUBE SHUT OFF VALVEO3i <br /> ®2.DROP TUBE O 3 ❑2.BALL FLOAT_ ❑4.EXEMPT <br /> ®3.STRIKER PLATE O Z <br /> IV.TANK LEAK DETECTION <br /> (A description of the monitoring program shall be submitted to the local agency.) <br /> IF SINGLE WALL TANK 453• IF DOUBLE WALL TANK OR TANK WITH BLADDER 454. <br /> (Check all that apply) (Check one item only) <br /> ❑ 1. VISUAL(EXPOSED PORTION ONLY) ❑5.MANUAL TANK GAUGING(MTG) ❑ I.VISUAL(SINGLE WALL IN VAULT ONLY) <br /> [12. AUTOMATIC TANK GAUGING(ATG) [:16.VADOSE ZONE 2.CONTINUOUS INTERSTITIAL MONITORING <br /> ❑3. CONTINUOUS ATG ❑7.GROUNDWATER ❑3.MANUAL MONITORING <br /> ❑4. STATISTICAL INVENTORY RECONCILIATION [:18.TANK TESTING <br /> (SIR)+BIENNIAL TANK TESTING ❑99. OTHER <br /> V.TANK CLOSURE INFORMATION/ PERMANENT CLOSURE IN PLACE <br /> ESTIMATED DATE LAST USED(YR/MO/DAY) 455• ESTIMATED QUANTITY OF SUBSTANCE REMAINING 456• TANK FILLED WITH INERT MATERIAL? 457. <br /> gallons []Yes ❑ No <br />