Laserfiche WebLink
30 August 2006 <br /> AGE-NC Project No. 06-1467 <br /> Page 2 of 7 <br /> 3.0. ON-SITE CONTROL <br /> The Site Safety Officer will coordinate site access control and security. A exclusion zone will be <br /> established approximately 10 feet around boring location work areas.No unauthorized person shall <br /> be allowed within this exclusion area. <br /> 4.0. HAZARD EVALUATION <br /> The following substance(s) or hazards are known or suspected to be on site. <br /> SUBSTANCES INVOLVED: CONCENTRATIONS: <br /> Unknown Unknown <br /> The additional potential hazards include: Slip-trip-fall hazards, noise, heavy equipment (i.e., <br /> excavator/backhoe), vibration hazards, traffic hazards, etc. <br /> 5.0. PERSONAL PROTECTIVE EQUIPMENT <br /> Based on evaluation of potential hazards, the following levels of personal protection have been <br /> designated for the applicable work areas or task: <br /> LOCATION: JOB FUNCTION: LEVELS OF PROTECTION: <br /> Exclusion Zone Excavation Area A B C D Other <br /> Reduction Zone Preserve samples A B C D Other <br /> Support Zone I Support functions I A B C D Other <br /> Advanced GeoEnvironmental,Inc. <br />