My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
713
>
2300 - Underground Storage Tank Program
>
PR0521604
>
COMPLIANCE INFO_2009 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2020 4:31:56 PM
Creation date
3/25/2020 11:38:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009 - 2018
RECORD_ID
PR0521604
PE
2371
FACILITY_ID
FA0014678
FACILITY_NAME
NATIONAL PETROLEUM
STREET_NUMBER
713
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13905214
CURRENT_STATUS
01
SITE_LOCATION
713 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
513
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> 1. SECONDARY PIPE TESTING <br /> -d 0 Professional <br /> Test Method Developed By: X Piping Manufacturer 0 Industry Standard Engineer <br /> 0 Other(Spec) <br /> Test Method Used: X Pressure F1 Vacuum 0 Hydrostatic <br /> 11 Other(Specify) <br /> Test Equipment Used:Pressure Gauges in Psi/Nitrogen Equipment Resolution: I/10-15 Psi <br /> 4- <br /> Piping Run 9 5 Piping Run#6 Piping Run 4 7 Piping Run 4 <br /> Piping Material: Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Ameron Ameron Ameron <br /> Piping Diameter: 2" 211 2" <br /> Length of Piping Run: Approx. 100' Approx.85' Approx. 100' <br /> Product Stored: Regular 87 Vent Super 91 Vent Diesel Vent <br /> Method and location of Clam Shell Test Port Clam Shell Test Port Clam Shell Test Port <br /> piping-run isolation: at Vent Sump at Vent Sump at Vent Sum <br /> Wait time between applying 10 Minutes 10 Minutes 10 Minutes <br /> pressure and starting test: <br /> Test Start Time: 10:10 10:20 10:30 <br /> Initial Reading(R,): 5 Psi 5 Psi 5 Psi <br /> Test End Time: 11:10 11:20 11:30 <br /> est En' <br /> EFinal Reading(RF): 5 Psi 5 Psi 5 Psi <br /> Test Duration: I Hour I Hour I Hour <br /> Change in Reading(RF-R,): 0 Psi 0 Psi 0 Psi <br /> P ss/ <br /> ass/Fail Threshold or <br /> Criteria:. <br /> I No Loss in Psi No Loss in Psi No Loss in Psi <br /> Criteria: <br /> T t <br /> es <br /> Test Result: X Pass 0 Fail X Pass 0 Fail X Pass 0 Fail 0 Pass 0 Fail— <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.