Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 5. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes (I <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested X (See Comments!) <br /> Test Method Developed By: D Spill Bucket Manufacturer Industry Standard Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: 0 Pressure [I Vacuum 11hydrostatic <br /> D Other(Specify) <br /> Test Equipment Used:I cd: Equipment Resolution: <br /> Spill Box# Spill Box# Spill Box# Spill Box= <br /> # <br /> Bucket Diameter: <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(R,): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-R,): <br /> Pass/Fail Threshold or <br /> Criteria: —1 <br /> Test Result: El Pass El Fail 0 Pass 0 Fail 0 Pass D Fail 0 Pass 0 Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Spill Buckets are tested annually with,Monitoring System Certification! <br />