Laserfiche WebLink
F. In-Tank Gauging I SIR Equipment: ® Check this box if tank gaug,,,,is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ® Yes ❑ No* Has ail input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ® Yes ❑ No* Was accuracy of system product level readings tested? <br /> ® Yes ❑ No* Was accuracy of system water level readings tested? <br /> ® Yes ❑ No* Were all probes reinstalled properly? <br /> ® Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In Section H,below,describe how and when these deficiencies were or will be corrected. <br /> Line Leak Detectors(LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the followingchecklist: <br /> ❑ Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all that apply) <br /> ❑ NIA Simulated leak rate: ®3 g.p.h.; ❑0.1 g.p.h; [10.2 g.p.h. <br /> ® Yes ❑ No' Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ® Yes ❑ No' Was the testing apparatus properly calibrated? <br /> ❑ Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ® N/A <br /> ® Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ N/A <br /> ® Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> ❑ N/A <br /> Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> ❑ N/A <br /> 21 Yes ❑ No' For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑ N/A <br /> Yes ❑ No' Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In Section H,below,describe how and when these deficiencies were or will be corrected. <br /> i. Comments: DIESEL AND 91 OCTANE HAD LARGE AMOUNTS OF AIR IN PRODUCT LINE <br /> THUS CAUSING THE L/D TO BE UNABLE TO DETECT LEAK RATE PROVIDED. <br /> SITE CANNOT AFFORD TO KEEP PROPER AMOUNTS OF FUEL IN SYSTEM,THEREFOR THIS <br /> WILL BE THE SITUATION EVERY TIME THE SITE GOES INTO LOW FUEL ALARM. <br /> PROPER PURGING AFTER EACH ONE OF THESE ALARMS WILL ALLOW THE SYSTEM <br /> TO DO ITS JOB CORRECTLY,OTHERWISE SYSTEM WILL CONTINUALLY HAVE AIR <br /> MASKING ANY PROBLEMS THAT IT SHOULD BE FINDING. THIS IS MULTIPLE YEARS IN A <br /> ROW THAT THIS HAS OCCURRED IT IS TIME TO FIND A SOLUTION RATHER THAN <br /> OTHER COMPANY'S COMING IN AND PRETENDING THEY HAVE FOUND THE SOLUTION. <br /> 1 RECOMMEND EITHER SHUT DOWN REGULAR TANK AND GO TO SINGLE GAS PRODUCT <br /> SITE,OR SWITCH TO MECHANICAL WHICH DEALS WITH AIR A BIT EASIER. <br /> **'`54-12 WENT BACK TODAY TO TEST 91 AND DSL PLLDS WITH INSPECTOR JEFF WONG . HAD TO PURGE <br /> DSL LINES THEN PASSED . 91 PASSED FIRST TRY. DAVE Winkler—Afforda Test <br /> Technician Name(print): DAVE WINKLER Signature: <br /> Certification 5263373-UT License No: 08-1739 <br /> No.: <br /> Testing Company Name: AFFORDA-TEST Phone No. (209)744-0113 <br /> Testing Company Address: 416 2" STREET GALT,CA 95632 Date of Testing/Servicing: 5-4-12 1 <br /> Monitoring System Certification Page 3 of 4 2/21/07 <br />