Laserfiche WebLink
t � <br /> FILE UPY <br /> San Joaquin County <br /> POUIN Environmental Health Department DIRECTOR <br /> Donna Heran, REHS <br /> 600 East Main Street <br /> Fillr+{/�� { Stockton, California 95202-3029 PROGRAM COORDINATORS <br /> Robert McClellon, REHS <br /> : Jeff Carruesco, REHS, RDI <br /> c --� y <br /> a ...... �i� Website: www.Sjgov.org/ehd Kase Foley, REHS <br /> i F o R Linda Turkatte, REHS <br /> Un- , 2011 Phone: (209) 468-3420 <br /> Fax: (209) 464-0138 <br /> Carl Wayne Henderson <br /> APEC <br /> PO Box 55105 <br /> Stockton, CA 95205 <br /> Re: ABC Food Mart SR0062600 <br /> 713 N. EI Dorado, Stockton, CA 95202 <br /> The San Joaquin County Environmental Health Department (EHD) has completed the review of <br /> the application for a permit to repair/adjust the diesel leak detector, and replace gaskets with <br /> Pomeco P31 1-G on the fill sumps and spill buckets on the underground storage tank (UST) <br /> system at the above noted address. The permit has been approved with the following <br /> conditions: <br /> 1. Contact the local fire department and the San Joaquin Valley Air Pollution Control <br /> District for any applicable permits and requirements. <br /> 2. Any changes in information and scope of work must be submitted to EHD for approval <br /> prior to commencing work. All new addenda supersede the previous ones. <br /> 3. Contact Jeff Wong at (209) 468-0335 to arrange the following inspection appointments <br /> (a 48-hour notice is required for inspection appointments). Please be aware that <br /> inspections for emergency work must be scheduled within five days of permit approval. <br /> a. Leak detector test: Leak detector must be tested to confirm that the device can <br /> detect a leak of 3 gallons per hour at 10 psi. <br /> b. Spill bucket test: Verify minimum 5-gallon capacity and pass a one hour hydrostatic <br /> test (or equivalent). Proper drainage must also be verified. <br /> c. Verify fill sumps are properly sealed to prevent water intrusion. <br /> Please be aware that the facility cannot operate the UST system prior to the EHD <br /> inspection and approval. <br /> 4. If concrete will be broken near the UST, a secondary containment test must be <br /> performed on the UST once concrete is poured in accordance with the manufacturer's <br /> guidelines. <br /> 5. Qualified service technicians must possess or work under the direct and personal <br /> supervision of an individual physically present at the work site who possesses all of the <br /> following: <br />