Laserfiche WebLink
II . Please include a copy of any studies ( soils , geology , marketing , <br /> etc . ) that you may have had prepared for this project or project <br /> site . <br /> C . PROJECT CHARACTERISTICS <br /> 1 . Services : Indicate how the following services will be provided <br /> for your project and availability of service . <br /> a . Wa ter S u P P I y :_- 'Private_Wells `____ ---_____--- ,-- --- <br /> b . Sewage Disposal- :_Scptic Tanks a_nd Leach Fields <br /> C . Storm Drainage : Natural _ <br /> If an extension of any of thc above is necessary , indicate <br /> which service ( s ) , what agency will be providing the <br /> service ( s ) , and the distance of the extension ( s ) : NA <br /> d . Natural Gas : None <br /> e . Electricity : P .G . & E . <br /> f . Road/Access ( i . e . , paved, unpaved, public/private , road name ) : <br /> Fine Road- Paved and Public Road <br /> g . Fire : Linden _Distance to nearest fire station : 5 miles <br /> h . Schools : Linden Unified School District <br /> i . Telephone : Continental Telephone <br /> 2 . Describe any site alterations which result from the proposed pro- <br /> ject ( specifically address the amount and location of grading , <br /> cuts and fills , vegetation removal , alterations to drainage, <br /> removal of existing structures , number of trees removed, ' etc . ) . <br /> None <br /> 3 . Air Quality Information : <br /> Number and type of vehicles associated with completed project <br /> 4 passenger vchicles- 2 per residence . <br /> Types of emissions and sources associated with project_ <br /> y�hicle Emissions — <br /> Fuel sources ( and amounts ) to be consumed by or as a result of the <br /> completed project None <br /> Will the project result in substantial air emissions or deteriora- <br /> tion of ambient air quality? X_NO YES <br /> 4 . How much agricultural land will be removed from production? <br /> f <br /> i .00 acre <br /> Irrigated Not irrigated Dry Pasture <br /> Minor Subdivision - 9 - ( 1/89 ) <br />