Laserfiche WebLink
HSC <br /> THE FOUOYYING INF1~71Q.........................X.....X................... <br /> T�ANR][ UMIENTA'I141I`MUSTBESt1BMITp?U DEVEOPMENTSRVICES BEFORE Check <br /> Y011p <br /> APPMA7M CAN 13E ACTED Ots. -off <br /> 1. One completed Application for a Residential Building Permit <br /> 2. Two complete sets of construction drawings,wet signed by designer(18'x 24'size paper)to include: <br /> a. Site plan drawn to scale showing property lines, north arrow, easements,well, septic tank, leach field and all existing and <br /> proposed development <br /> b. Building elevations (north,south, east and west views). <br /> C. Floor plan (include plumbing and electrical fixture locations and HVAC equipment location). <br /> d. Foundation plan with representative details. <br /> e. Floor, ceiling and roof framing details including framing layouts, cross sections and sizing details of all members. <br /> f. Framing sections and details. <br /> g. Masonry fireplace plan and construction section. <br /> h. Truss layout and calculations: <br /> 1) Identifying all trusses. <br /> 2) All truss calculations shall be stamped and a wet signature provided by a California licensed designer. <br /> I. Engineering calculations: <br /> 1) Engineering calculations will be required for any unusual design which is not covered by Chapter 25 of the <br /> 'Uniform Building Code.' <br /> 2) L11engineering plans and calculations shall be stamped, if by an engineer, and Include a wet signature of a <br /> California licensed engineer or architect <br /> 3. Flood Certificate (if required). <br /> 4. School Certificate (if required). <br /> 5. Two (2) sets of energy calculations. <br /> 6. Permit Deposit <br /> TO BE COMPLETED BY THE DEVELOPMENT SERVICES DIVISION <br /> PROPERTY INFORMATION Date: Technician: <br /> Zoning, Zone:�G 4 Front: 30' Left: l�� Right: lot Rear: �� Height: :3 <br /> Setback',!4 <br /> Flooding Approved Use: Flood Fringe:Yea ( ) No (�¢ N.G.V.D,,� <br /> Districts Water: �/ Fire:_ School:�SrG(Oh �! �19 <br /> Sanitary: , C, �Q�<h��h lay �,L/ <br /> Driveway Existing ( ) New ,( AC Paving ( ) Concrete ( ) 1/3 Rd. Pipe ( ) Sidewalk ( ) <br /> TO BE COMPLETED BY THE DEVELOPMENT SERVICES DIVISION <br /> BUILDING INFORMATION Date: Technician: <br /> Scope of Work: <br /> Occupancy Group: Type of Construction: <br /> Section InhiaUitem No: Energy/Handicap: 0 ( ) 1 ( ) 2( ) 3( ) <br /> Plan Check Fee: Yes( ) No( ) Commercial: ( ) Residential: ( ) <br /> Group No: Type: Sq. Ft: $Per Sq. Ft: Valuation: <br /> Plumb: Mach: Elect: <br /> Plumb: Mach: Elect: <br /> Group No: Type: Sq. Ft: $Per Sq. Ft: Valuation: <br /> Plumb: Mach: Elect: <br /> Plumb: Mach: Elect: <br /> Group No: Type: Sq. Ft: $Per Sq. Ft: Valuation: <br /> Plumb: Mech: Elect: <br /> Microfilm: Receipt No: Amount Paid: <br /> Comments: <br /> Public Works Local Health APCD <br />