My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008939
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
2835
>
2900 - Site Mitigation Program
>
PR0001205
>
ARCHIVED REPORTS_XR0008939
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2020 10:20:37 AM
Creation date
3/30/2020 10:17:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008939
RECORD_ID
PR0001205
PE
2951
FACILITY_ID
FA0004012
FACILITY_NAME
UNOCAL BULK PLANT #0950
STREET_NUMBER
2835
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
CURRENT_STATUS
02
SITE_LOCATION
2835 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KAPREALIAN ENGINEERING <br /> N C O R A O R A T E D <br /> DEC D <br /> ENVIRONMENTAL HEALTH KEI-P92-0205 .P3 <br /> PERMIT/SERVICES October 6, 1992 <br /> PROPOSAL TO <br /> UNOCAL CORPORATION <br /> for the <br /> Former Unocal Bulk Plant #0950 <br /> 2835 Navy Drive <br /> Stockton, California <br /> GROUND WATER MONITORING, SAMPLING AND ANALYSIS <br /> INTRODUCTION <br /> Per the recommendations described in Kaprealian Engineering, Ines. <br /> (KEI) report KEI-J92-0205.R1 dated October 6, 1992 , KEI proposes <br /> the following work plan. <br /> PROPOSED TASK <br /> 1. Redevelop all seven existing monitoring wells (see the <br /> attached Site Plan) . Purge until effluent is free of <br /> turbidity. <br /> 2 . Monitor all existing wells on-site on a monthly basis . Record <br /> the elevation of the water table and any abnormal conditions <br /> noted during inspection, including presence of product and <br /> sheen. <br /> 3 . Purge and sample ground water from all monitoring wells <br /> on a quarterly basis, and analyze for total petroleum <br /> hydrocarbons (TPH) as gasoline, benzene, toluene, xylenes <br /> and ethylbenzene, and TPH as diesel on a quarterly basis. <br /> Prior to sampling, water table elevation will be recorded <br /> as well as the presence of any free product. <br /> 4 Prepare quarterly technical reports summarizing the field <br /> activity water sampling and analyses with discussion and <br /> recommendations. <br /> The purging of ground water and sampling should continue for six <br /> months. This proposed monitoring and sampling program should be <br /> re-evaluated after six months. <br /> 2401 Stanwell Drive Suite 400 <br /> Concord,California 94520 <br /> Tel 510 602 5100 Fax 510 687 0602 <br />
The URL can be used to link to this page
Your browser does not support the video tag.