Laserfiche WebLink
Project: YFS-Stockton Field Log of Boring TSB-3 <br /> C LITHOLOGIC DESCRIPTION UTHO� 1TCONSOp�nWE� m REMARKS <br /> 60 as above,SILTY CLAY CL 34 <br /> 12 35 TSB-3-12 <br /> 61 Terminate boring at 60.5'feet,backfill to <br /> approximately 34 feet with neat cement grout <br /> 62 then backfill with tank excavation material to <br /> surface <br /> 63 <br /> 64 <br /> 65 <br /> 66 <br /> 67 <br /> 68 <br /> 69 <br /> 70 <br /> 71 <br /> 72 <br /> 73 <br /> 74 <br /> 75 <br /> 76 <br /> 77 <br /> 78 <br /> 79 <br /> Woodward-Clyde Consultants Page 4 of 4 <br />