Ms. Devra Lewis • • Project 812717 <br /> April 9, 2001 <br /> Page 3 of 4 <br /> space between the PVC casing and the borehole wall. Sand will be added to the borehole through <br /> the temporary casing to provide a uniform filter pack around the casing and to stabilize the <br /> borehole. The sand pack will be placed to a maximum of 2 feet above the screens,followed by a 3- <br /> foot seal consisting of bentonite pellets. Cement grout containing 5 percent bentonite will be placed <br /> above the bentonite seal to the ground surface. A watertight locking cap will then be installed over <br /> the top of the well casing and a well monument or flush-mount traffic-rated vault box installed over <br /> the well. The proposed well completion details are shown in Table 1. A detailed discussion of <br /> drilling methods and well construction details are presented in Appendix A. <br /> Task 2C - Groundwater Monitoring Well Development and Surveying <br /> The monitoring wells will be developed by bailing, surging with a surge block, pumping, or a <br /> combination of these techniques. Development will continue, to the extent practical, until the <br /> development water runs clean and pH and conductivity measurements stabilize (pH varies less <br /> than or equal to 0.02 and conductivity varies less than 10 percent). After the wells have been <br /> developed and water levels have stabilized the water levels will measured and the volume of <br /> water removed from each well will be recorded and included in the investigation report. <br /> The newly installed monitoring wells will be included in the ongoing quarterly groundwater <br /> monitoring and reporting program and will be sampled during the subsequent sampling event. <br /> IT will contract a licensed land surveyor to survey the well location and top of casing with <br /> respect to mean sea level. <br /> TASK 3 - REPORTING <br /> IT will prepare an investigation report following completion of field activities and receipt of <br /> analytical results. The report will summarize the field work performed, present drilling and <br /> sampling procedures, and include a boring/well location map, revised geologic cross-sections (if <br /> warranted), and interpretation and discussion of the subsurface investigation results. <br /> PROJECT SCHEDULE <br /> IT anticipates the well installation and well development will require approximately 15 to 20 <br /> days to complete. IT proposes to schedule a driller upon receiving approval of this workplan. IT <br /> will contact the RWQCB and the DEH-HMD a minimum of five days prior to beginning field <br /> activities. The report will be completed within one month of the completion of fieldwork. <br /> /T CORPORA TION <br /> C:\My DocumentsTrojectsTort of Stockton\Well Install\workplan.doc <br /> Rev.0,4/9/01 <br />