Laserfiche WebLink
Table 1 <br /> Proposed Well Completions <br /> Well Number Completion Zone Anticipated Screen Interval <br /> (ft bgs) III <br /> OW-1A A-Zone <br /> OW-2A 4-19 <br /> A-Zone <br /> OW-2B 4-19 <br /> B-Zone <br /> OW-3C 28-38 <br /> C-Zone <br /> OW-3D52-62 <br /> Lower C-Zone/Upper D-Zone <br /> OW-4A A-Zo72-82 <br /> ne <br /> OW-4B 4-19 <br /> B-Zone <br /> OW-4C 32-42 <br /> C-Zone <br /> 63-73 <br /> OW-SD <br /> Lower C-Zone/Upper D-Zone <br /> 77-87 <br /> OW-6D <br /> Lower C-Zone/Upper D-Zone <br /> OW-7A 70-80 <br /> A-Zone 4-19 <br /> OW-7B B-Zone <br /> OW-7C 37-47 <br /> C-Zone 57-67 <br /> OW-7D Lower C-Zone/Upper D-Zone <br /> OW-8A 80-90 <br /> A-Zone 4-19 <br /> OW-8B B-Zone <br /> 35-45 <br /> OW-8c C-Zone <br /> Notes: 65-75 <br /> [I] Top of screen interval in A-Zone wells may vary depending on groundwater elevation. <br /> bgs—below ground surface <br />