Laserfiche WebLink
MONITORING AND REPORISORDER NO. R5-2011-0813 - 5- <br /> BRITISH <br /> 5- <br /> BRITISH PETROLEUM COMPANY, BUCKEYE PARTNERS, L.P., <br /> TESORO PETROLEUM COMPANY, <br /> AND FORMER TIME OIL COMPANY <br /> STOCKTON TERMINALS TECHNICAL COMMITTEE <br /> STOCKTON, SAN JOAQUIN COUNTY <br /> (g) Cumulative data tables for all major constituents of concern containing the <br /> water quality analytical results and depth to groundwater for all monitoring <br /> wells for the past five years, if applicable. Raw laboratory data shall be <br /> provided on CD or DVD and included in the report. The Central Valley Water <br /> Board may request additional data as necessary. <br /> (h) A copy of the laboratory analytical data report. <br /> (i) If applicable, the status of any ongoing remediation, including cumulative <br /> information on the mass of pollutant removed from the subsurface, system <br /> operating time, the effectiveness of the remediation system, and any field <br /> notes pertaining to the operation and maintenance of the system. <br /> Q) If applicable, the reasons for and duration of all interruptions in the operation <br /> of any remediation system, and actions planned or taken to correct and <br /> prevent interruptions. <br /> 8. An Annual Report shall be submitted to the Central Valley Water Board by <br /> 1 February of each year. This report shall contain an evaluation of the effectiveness <br /> and progress of the investigation and remediation, and may be substituted for the <br /> fourth quarter monitoring report, provided that all information that must be submitted <br /> in the fourth quarter report is included, along with the following minimum information: <br /> (a) Both tabular and graphical summaries of all data obtained during the year. <br /> (b) Groundwater contour maps and pollutant concentration maps containing all <br /> data obtained during the previous year. <br /> (c) A discussion of the long-term trends in the concentrations of the pollutants in <br /> the groundwater monitoring wells. <br /> (d) An analysis of whether the pollutant plume is being captured by an extraction <br /> system or is continuing to spread. <br /> (e) A description of all remedial activities conducted during the year, an analysis <br /> of their effectiveness in removing the pollutants, and plans to improve <br /> remediation system effectiveness. <br /> (f) An identification of any data gaps and potential deficiencies/redundancies in <br /> the monitoring system or reporting program. <br /> (g) If applicable, a proposal and rationale for any revisions to the groundwater <br /> sampling plan frequency and/or list of analytes. <br />