Laserfiche WebLink
' 0 0 <br /> locations monthly. In addition, sampling and analysis of ground- <br /> water will be performed at test holes TS-8, TS-9 , and TS-10 and <br /> at wells M-1 and M-2 biannually for one year . Proposed sampling <br /> ' activities will be conducted in September 1988 and March 1989 . A <br /> letter report containing measured groundwater elevations and <br /> product thickness to date and groundwater quality analytical <br /> ' results will be submitted four weeks after each sampling. <br /> 'I <br /> 1 <br /> ' - 21 - <br />