Laserfiche WebLink
MONITORING AND REPORTIN•ROGRAM NO. 5-01-821 • -3- <br /> KINDER MORGAN ENERGY PARTNERS <br /> THROUGH ITS OPERATING PARTNERSHIP SFPP,L.P. <br /> BULK FUEL TERMINAL <br /> SAN JOAQUIN COUNTY . <br /> As required by the California Business and Professions Code Sections 6735, 7835, and 7835.1, <br /> all reports shall be prepared by a registered professional or their subordinate and signed by the <br /> registered professional. <br /> Semi-annual reports shall be submitted to the Board by the 30th day of the month following the <br /> end of each six-month period (i.e.,by 30 April and 30 October) until such time as the <br /> Executive Officer determines that the reports are no longer necessary. Each semi-annual report is <br /> to include the following minimum information: <br /> (a) A description of the semi-annual groundwater sampling event, including field logs. At a <br /> minimum, field logs shall contain water quality parameters measured before, during, and <br /> after purging, method of purging, depth of water, volume of water purged, etc.; <br /> (b) Groundwater contour maps for all groundwater zones, if applicable; <br /> (c) Isocontour contaminant concentration maps for all groundwater zones, if applicable; <br /> (d) A table showing well construction details such as well number, groundwater zone being <br /> monitored, coordinates (northings and eastings), ground surface elevation,reference <br /> elevation, elevation of screen, elevation of bentonite, elevation of filter pack, and elevation <br /> of well bottom; <br /> (e) A table showing historical lateral and vertical (if applicable) flow directions and gradients; <br /> (f) Cumulative data tables containing the water quality analytical results and depth to <br /> groundwater; <br /> (g) A copy of the laboratory analytical data report; <br /> (h) If applicable, the status of any ongoing remediation, including cumulative information on <br /> the mass of contaminant removed from the subsurface, system operating time, the <br /> effectiveness of the remediation system, and any field notes pertaining to the operation and <br /> maintenance of the system; and <br /> (i) If applicable, the reasons for and duration of all interruptions in the operation of any <br /> remediation system, and actions planned or taken to correct and prevent interruptions. <br /> An annual report shall be submitted to the Board by 30 January of each year. This report shall <br /> contain an evaluation of the effectiveness and progress of the investigation and remediation, and <br /> may be submitted with the second semi-annual monitoring report. The annual report shall <br /> contain the following minimum information: <br />