Laserfiche WebLink
u <br /> 1993 353 Sacramento Street,Suite 1140 <br /> MWI CROWSM- ENVIRONMENTAL HEALTHan Francisco, California 94111 <br /> B �c p FAX 415.391.2216 <br /> PERMIT/SERVICES 475.391.1885 <br /> Earth and Environmental Technologies <br /> March 15, 1993 <br /> Regional Water Quality Control Board <br /> Central Valley Region <br /> 3443 Routier Road, Suite A <br /> Sacramento, CA 95827-3098 <br /> Attention: Mr. Phil isorena <br /> Reference: Revised Project Schedule (Revision No. 2) <br /> Installation of B-zone Monitoring Well/ <br /> Additional Site Assessment Field Work <br /> Santa Fe Pacific Pipeline Partners,L.P. <br /> Stockton Terminal Facility <br /> 2947 Navy Drive Stockton,California T-6075.02 <br /> Dear Mr. Isorena: <br /> Hart Crowser Inc. has prepared the attached Revised Project Schedule on behalf of <br /> Santa Fe Pacific Pipeline,L.P. (SFPP) for the installation of a B-zone monitoring well and <br /> completion of the shallow soil borings at the above-referenced site. The completion of <br /> these field activities (Work Plan Addendum for the Additional Site Assessment, dated <br /> February 11, 1993), previously scheduled for March 16,1993,is delayed due to the <br /> saturated (near surface) groundwater conditions currently observed at the site. This <br /> revised schedule is dependent on future weather conditions at the site. <br /> If you have any comments or questions,please contact us at(415) 391-1885 or Mr.James <br /> Holland with SFPPL at ('213)486-7947. <br /> Sincerely, <br /> HART CROWSER,INC. <br /> Peter B. Hudson Dharme Rathnayake,P.E. <br /> Project Geologist Technical Manager <br /> cc: James Holland,Santa Fe Pacific Pipeline Partners <br /> Margaret lagorio,REHS,San Joaquin County Public Health Services, <br /> Environmental Health Division <br /> Seattle,Tacoma,Richland,Anchorage,Portland,San Francisco,Long Beach <br />